My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2011_PS-1101501 thru PS-1102000_ - PS-1101718 (2)
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2011
>
PS-1101501 thru PS-1102000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2011_PS-1101501 thru PS-1102000_ - PS-1101718 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:55:46 PM
Creation date
12/30/2015 11:51:29 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1101718 (2)
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2011\PS-1101501 thru PS-1102000
Year2
2011
Supplemental fields
Applicant
PACIFIC GAS & ELECTRIC - STOCKTON
Contracts
CrossReference
Date Entered
8/17/2011
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
N/S OF MC ALLEN RD. FROM THE CALAVERAS RIVER TO WI
Primary Parcel
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
nIDER <br /> SPECIAL CONDITIONS FOR <br /> PG & E— MCALLEN ROAD <br /> ENCROACHMENT PERMIT <br /> 1. NO work allowed during peak hours, which are 6:00 A.M. thru 8:00 A.M. and 3:00 P.M. thru 6:00 <br /> P.M. <br /> 2. No app-oval for setting the signal light to flash. <br /> 3. Maintain traffic controls. for all roads. Traffic control delays shall not exceed 15 minutes. <br /> Two-way traffic shall be maintained during non-working hours with excavated areas backfilled or <br /> plated. During working hours, two-way traffic control shall be maintained with one lane open and <br /> appropriate flaggers. <br /> 4. Mc Allei Road and Newton Road are extremely busy and experience long back-ups. Advise <br /> traffic iri advance of delays and suggest an alternate route. <br /> 5. Notify San Joaquin County Traffic Division at least 72 hours prior to excavation, so that contact <br /> can be made to locate signal conduits and loops. <br /> 6. Access to all properties shall be maintained at all times except when work is occurring at the <br /> access point. Minimal delays will be allowed to provide access within the work zone area. <br /> Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br /> contractor shall be replaced with in-kind or better materials. <br /> 7. Residents and businesses shall be notified in writing, as approved by the County, 48-hours in <br /> advance of any impacts to their access. <br /> 8. Any areas where parking is to be restricted shall have signs noticing the time period placed at <br /> least 48 hours in advance of the work. <br /> 9. No trench cutting of County roads shall occur between November 1 and March 31 without prior <br /> authorization by the County. <br /> 10. Final paving for trench repair or road resurfacing shall be per Caltrans' specifications and shall <br /> not occur between November 1 and March 31 unless authorized by the County. <br /> 11. All pipe and pipeline related facilities including, but not limited to, valves, utility boxes and vaults, <br /> and frarnes and covers shall be maintained by the Pacific Gas & Electric (PG & E). PG & E shall <br /> be responsible for any and all costs associated with the relocation and/or adjustment of these <br /> facilities as determined by the County at the City's expense. (Streets and Highways Code 1463) <br /> 12. All future maintenance of the pipeline and related facilities within the County right-of-way will <br /> require a San Joaquin County Encroachment Permit. <br /> 13. Length of open, unbackfilled trench shall be limited to a total maximum length of 250 linear feet <br /> during working hours. <br /> 14. Trenches shall be maintained in a smooth and even condition to the satisfaction of the County <br /> throughout the project limits at all times. <br />
The URL can be used to link to this page
Your browser does not support the video tag.