My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2011_PS-1101501 thru PS-1102000_ - PS-1101788
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2011
>
PS-1101501 thru PS-1102000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2011_PS-1101501 thru PS-1102000_ - PS-1101788
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:56:08 PM
Creation date
12/30/2015 11:44:36 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1101788
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2011\PS-1101501 thru PS-1102000
Year2
2011
Supplemental fields
Applicant
PACIFIC GAS & ELECTRIC - FRESNO
Contracts
CrossReference
Date Entered
8/25/2011
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
BOTH SIDES OF RIPON RD. 300' W/O FREDERICK RD.
Primary Parcel
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
s � <br /> PS-1101788 R I D E R ------ <br /> June 12, 2012 <br /> Date G Z REVISED <br /> SPECIAL CONDITIONS FOR <br /> PG&E-WEST RIPON RD.-PM 30847271 <br /> ENCROACHMENT PERMIT <br /> 1. Maintain traffic controls for all roads. Traffic control delays shall not exceed 15 minutes. <br /> Two-way traffic shall be maintained during non-working hours with excavated areas backfilled or <br /> plated. During working hours, two-way traffic control shall be maintained with one lane open and <br /> appropriate flaggers. <br /> 2. No working between the hours of 6:00 a.m. to 9:00 a.m. and 3:00 p.m. to 6:00 p.m. <br /> 3. Access to all properties shall be maintained at all times except when work is occurring at the <br /> access point. Minimal delays will be allowed to provide access within the work zone area. <br /> Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br /> contractor shall be replaced with in-kind or better materials. <br /> 4. Residents and businesses shall be notified of the work schedule in writing, as approved by the <br /> County, 48-hours in advance of any impacts to their access. <br /> 5. Any areas where parking is to be restricted shall have signs noticing the time period placed at <br /> least 48 hours in advance of the work. <br /> 6. West Ripon Road was resurfaced in 2010 with rubberized asphalt concrete. Pacific Gas & <br /> Electric (PG&E) shall make every effort to ensure the reliability of the pavement and not intrude <br /> into the pavement any further than required per PG&E. <br /> 7. The contractor shall use San Joaquin County Standard R-29 when backfilling trenches within the <br /> County right-of-way. PG&E shall repair any damaged pavement using the same materials as <br /> currently in place. PG&E will ensure rubberized asphalt is used in all of their repairs. <br /> 8. All pipe and pipeline related facilities including, but not limited to, valves, utility boxes and vaults, <br /> and frames and covers shall be maintained by PG&E. PG&E shall be responsible for any and all <br /> costs associated with the relocation and/or adjustment of these facilities as determined by the <br /> County at PG&E's expense. (Streets and Highways Code 1463) <br /> 9. All future maintenance of the pipeline and related facilities within the County right-of-way will <br /> require a San Joaquin County Encroachment Permit. <br /> 10. Length of open, unbackfilled trench shall be limited to a total maximum length of 250 linear feet <br /> during working hours. <br /> 11. Trenches shall be maintained in a smooth and even condition to the satisfaction of the County <br /> throughout the project limits at all times. <br /> 12. All trenches shall be completely backfilled or shored and plated at the end of each workday, and <br /> the roadway restored to two-way traffic. If plating is to be used, a trench shoring and plating plan <br /> suitable for traffic loadings shall be prepared by a registered civil engineer and submitted for prior <br /> approval by the County. <br />
The URL can be used to link to this page
Your browser does not support the video tag.