My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2011_PS-1101501 thru PS-1102000_ - PS-1101968 (2)
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2011
>
PS-1101501 thru PS-1102000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2011_PS-1101501 thru PS-1102000_ - PS-1101968 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:56:40 PM
Creation date
12/30/2015 11:37:59 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1101968 (2)
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2011\PS-1101501 thru PS-1102000
Year2
2011
Supplemental fields
Applicant
MOUNTAIN CASCADE. INC.
Contracts
CrossReference
Date Entered
9/8/2011
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
KOSTER ROAD NORTH OF BLEWETT ROAD
Primary Parcel
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Scott Cooper <br /> From: Kevin Downs [Kevin D@mountaincascade.com] <br /> Sent: Friday, September 16, 2011 1:46 PM <br /> To: Alex Chetley <br /> Cc: Scott Cooper; Greg Lutes; Ed C <br /> Subject: FW: HH 935B draft TC Plan for Bird Rd <br /> Attachments: Bird Rd TCP 10.pdf <br /> Alex, <br /> We have revised the traffic control plan at Bird Rd. to add temporary pavement on the shoulder and route traffic along side to <br /> allow us to cross the road quicker. The traffic control requirements at Bird Rd. remain the same. All temporary pavement will <br /> be removed and the road restored to its existing condition. Please advise if the county takes any exception to this revised <br /> plan. <br /> Please note that Mountain Cascade is scheduled to cross Bird Rd. with the Pipeline on September 28th, 2011. This will be a <br /> one day traffic system for excavation and installation of pipe. Backfill and Paving will require two additional days of traffic <br /> control tentatively scheduled for October 6th and October 12th respectively (Please note these dates are subject to change and <br /> Mountain Cascade will continue to notify SJ County in advance of any work). <br /> Thank you, <br /> Kevin Downs <br /> Mountain Cascade, Inc. <br /> 925-525-8199 <br /> From: Greg Lutes <br /> Sent: Friday, September 16, 20119:18 AM <br /> To: Kevin Downs; John Eudy <br /> Subject: FW: HH 935B draft TC Plan for Bird Rd <br /> Bird Rd. shoe fly for your review <br /> From: Kevin Hilz [mailto:kmichaelhilz@yahoo.com] <br /> Sent: Thursday, September 15, 20118:22 AM <br /> To: Greg Lutes <br /> Cc: John Eudy; Mariano Hernandez <br /> Subject: HH 935B draft TC Plan for Bird Rd <br /> John, Greg, <br /> This tcp is a draft of how we expect the construction phasing to proceed. If you agree, let us know so our <br /> engineer can stamp it for submittal. <br /> Thanks, <br /> K M Hilz <br /> M Hernandez Eng <br /> 415-559-2264 <br /> kmichaelhilz(�i_)yahoo.com <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.