Laserfiche WebLink
Title 23 Central Valley Flood Protection Board § 123 <br /> (2)Schedule 80 polyvinyl chloride(PVC)pipe is allowed if it is entire- (A)The steel pipe is resilient and not materially reduced in quality due <br /> ly buried,all joints are threaded and the components were continually to weathering,prior use or other deteriorating conditions. <br /> protected from ultraviolet radiation damage or were newly manufac- <br /> tured. (B)The steel pipe joints are butt welded or threaded. <br /> (C)The steel pipe installations are corrosion proofed externally with <br /> (3)Polyvinyl::hloride(PVC)plastic pipe schedule 40,or better,may a coating of material such as coal tar enamel,asphalt dipped wrap,mor- <br /> be used as a conduit for power or communication cables. tar,PVC tape,or polyethylene tape wrapped to a thickness of thirt <br /> (4)High density polyethylene pipe may be used for pipeline or con- mils,high solids epoxy,or equivalent. y(30) <br /> duit installation.provided the following conditions are met: (D)Unless a continuous internal lining of cement,mortar,or equiva- <br /> (A)High dem-ity polyethylene pipeline or conduit joints must be heat lent is provided,as appropriate for the fluid to be conveyed,new steel <br /> or electrofusion welded (ASTM Standard F1055-93, dated 1993 or pipe installations may convey only non corrosive material,and water is <br /> D3261 93,dates 1993 which is incorporated by reference). considered corrosive. <br /> (B) High-der.:;itv polyethylene pipelines and conduits must be de- (E) Steel pipe installations must be designed to resist all anticipated <br /> signed to resist all anticipated loading conditions,and the design calcula- loading conditions,and the design calculations must be submitted to the <br /> tions must be submitted to the board. board.Steel pipe meeting the following criteria may be used without sub- <br /> (C)High density polyethylene pipelines and conduits must be ultra- mittal of design calculations to the board: <br /> violet radiation protected. (i)Twelve-(12)inches in diameter or less ten f 0 <br /> (5)Cast in-place reinforced concrete pipes and box culverts maybe ( )gauge steel pipe. <br /> used above and below the design flood plane if the concrete is at least six niches in diameter sevn twelve-(7 12)inches and a maximum of thirty- (30) <br /> (6)inches thick (7)gauge steel pipe. <br /> (iii)Greater than thirty -(30) inches and a maximum of forty -eight <br /> (6) Precast reinforced concrete pipes and box culverts and concrete (48)inches in diameter three (3)gauge steel pipe. <br /> cylinder pipes rmiy be used above and below the design flood plane if the (h)The following materials are not allowed for pipelines or conduits <br /> following condit.:ons are met: used to carry natural gas or fluids: <br /> (A) Precast reinforced concrete pipe meets ASTM Specification (1)Aluminum pipe within a levee section or within ten(10)feet of le- <br /> C'76 90,dated 1990 which is incorporated by reference. vee toes. <br /> (B) Precast reinforced concrete pipe joints and precast box culvert (2)Cast iron pipe within a levee section or within ten(10)feet of levee <br /> joints are encased in reinforced concrete cast in-place against firm un- toes. <br /> disturbed earth. (3) Pipe with flanges, flexible couplings, or other mechanical COLI- <br /> (C)The cylin(lers of concrete cylinder pipes are welded and corrosion plings within a levee section or within ten(10)feet of levee toes. <br /> protected internally and externally. (4)Prestressed concrete pipe within a Levee section or within ten(10) <br /> (D)When installed below the design flood plane,precast reinforced feet of levee toes. <br /> concrete pipe and concrete cylinder pipe must be encased below the NOTE: Authority cited: Section 8571, Water Code. Refl_rene: Sections 8608, <br /> springline in con:;rete cast against undisturbed earth. 8710 and 8712.Water Code. <br /> (7)Steel pipe may be used for all types of pipeline or conduit installa- HISTORY <br /> tions through a 1.vee above the design flood plane if the pipe meets the 1.New section and figures 8.04,8.05 and 8.06 Fled 9 30-96.operative 10-30-96 <br /> following requirtrients: (Register 96,No.40). <br /> Page 4.25 Register 2009,No.49;12-4-2009 <br />