My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2011_PS-1102000 thru PS-1102500_ - PS-1102193
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2011
>
PS-1102000 thru PS-1102500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2011_PS-1102000 thru PS-1102500_ - PS-1102193
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:57:24 PM
Creation date
12/30/2015 12:12:05 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1102193
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2011\PS-1102000 thru PS-1102500
Year2
2011
Supplemental fields
Applicant
SAIC - WILLIAM SLOWIK
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
S/S OF BYRON RD. 700' & 1,500' W/O GRANT LINE RD.
Primary Parcel
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SPECIAL CONDITIONS FOR <br /> BYRON ROAD TEMPORARY DRIVEWAY APPROACHES <br /> ENCROACHMENT PERMIT <br /> 1. It is the responsibility of the applicant to ensure existing drainage improvements convey <br /> drainage during and after construction and match pre-construction conditions. <br /> 2. Submit detailed traffic control plans affecting County roads for review and approval prior <br /> to start of any work — no exceptions. <br /> 3. All traffic control signage shall adhere to the Manual on Uniform Traffic Control Devices <br /> (MUTCD). <br /> 4. All traffic control signage shall be sacked/removed at the end of each work day during the <br /> entire 3 week project. <br /> 5. County roads shall be kept clean from mud and debris at all times along the access <br /> points and work zone areas during entire project. All standard roadway striping and <br /> signage shall be clearly visible, maintained and restored throughout the construction <br /> zone during and after the project. <br /> 6. In addition to standard dust control measures, Byron Road shall be maintained in a clean <br /> condition, free of dirt, mud, gravel and/or aggregate base and debris during construction <br /> activities. The contractor shall provide daily, or as needed, street sweeping using a <br /> modern mechanical or vacuum-assisted street sweeper. <br /> 7. The contractor shall not conduct construction operations in rain or heavy fog conditions. <br /> 8. The gravel/aggregate roadbase shall be removed upon termination of the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.