Laserfiche WebLink
September 28, 201.2 <br /> EL DORADO STREET CLOSURE DETOUR <br /> r <br /> 1. Location- 0.04 miles north o� 1'rench Camp dough <br /> -2, 119urs of Closure: 6:30am to 4:00pm' <br /> 3. Dates of Closure- To Be Determined, Sic ht lo,.., es <br /> 4. Purpose of Closure: 12 Ilo <br /> a. F alsework erection(1 week) Nom• — A b A , zo r z <br /> b. Concrete pour of bridge soffit and stems (1 day) Ta„,,,u�y i,zoic <br /> c. Concrete pour of bridge deck(1 day) i-a brr.a�y y do/3 <br /> d. Falsework removal (1 week) m,,4, ►, zo'3 <br />