My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2011_PS-1102000 thru PS-1102500_ - PS-1102210
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2011
>
PS-1102000 thru PS-1102500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2011_PS-1102000 thru PS-1102500_ - PS-1102210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:57:29 PM
Creation date
12/30/2015 12:14:40 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1102210
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2011\PS-1102000 thru PS-1102500
Year2
2011
Supplemental fields
Applicant
C.C. MEYERS INC.
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
BOTH SIDES OF EL DORADA ST.
Primary Parcel
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SPECIAL CONDITIONS FOR <br /> SPERRY ROAD EXTENSION PROJECT <br /> ENCROACHMENT PERMIT <br /> 1. Final paving for trench repair or road resurfacing shall be per Caltrans' specifications and <br /> shall not occur between November 1 and March 31 unless authorized by the County. <br /> 2. Where the existing road structural section is below standard, a minimum section of 3 <br /> inches of asphalt concrete over 8 inches of aggregate base shall be required, except <br /> where specific road structural sections apply. <br /> 3. Temporary pavement shall be provided for all trench areas within three days of pavement <br /> removal or by Friday of each week, whichever is more restrictive. <br /> 4. Final trench paving shall be placed when the length of temporarily surfaced trench <br /> exceeds 1,500 linear feet or by segment of road as determined by the County. Final <br /> trench paving will also be required to be placed when interruptions or delays of the work <br /> exceed two (2) weeks. <br /> 5. All pavement conforms shall be ground to provide a flush surface. Contractor shall grind <br /> and overlay within 10 working days of permanent trench paving. Shoulder areas shall be <br /> brought up to the finish grade as directed by the County. <br /> 6. All trenches shall be completely backfilled or shored and plated at the end of each <br /> workday, and the roadway restored to two-way traffic. If plating is to be used, a trench <br /> shoring and plating plan suitable for traffic loadings shall be prepared by a registered civil <br /> engineer and submitted to the County for approval. <br /> 7. Length of open, unbackfilled trench shall be limited to a total maximum length of 350 <br /> linear feet during working hours. <br /> 8. The contractor shall use San Joaquin County Standard R-29 when backfilling trenches <br /> within the County right-of-way. Where the existing road structural section is below <br /> standard, a minimum section of 3 inches of asphalt concrete over 8 inches of aggregate <br /> base shall be required. <br /> 9. Trenches shall be maintained in a smooth and even condition to the satisfaction of the <br /> County throughout the project limits at all times. <br /> 10. All pipe and pipeline-related facilities including, but not limited to, valves, utility boxes and <br /> vaults, and frames and covers shall be maintained by City of Stockton. <br />
The URL can be used to link to this page
Your browser does not support the video tag.