My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2011_PS-1102000 thru PS-1102500_ - PS-1102210
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2011
>
PS-1102000 thru PS-1102500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2011_PS-1102000 thru PS-1102500_ - PS-1102210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:57:29 PM
Creation date
12/30/2015 12:14:40 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1102210
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2011\PS-1102000 thru PS-1102500
Year2
2011
Supplemental fields
Applicant
C.C. MEYERS INC.
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
BOTH SIDES OF EL DORADA ST.
Primary Parcel
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Chart No. 1 <br /> Conventional Hi hway Lane Re uirements <br /> Route:Local Streets PM: <br /> County: SJ p Road <br /> Closure Limits:El Dorado Road,McKinley Avenue,Performance Drive and Sperry <br /> FROM HOUR TO HOUR 24 1 2 3 4 5 6 7 8 9 loll 12 13 14 15 16 17 18 19 201 1C22C23C24 <br /> Mondays through Thursdays C C C C C C — - <br /> Fridays C C C C C C <br /> Saturdays 1 C C C <br /> Sundays <br /> Le end: <br /> 1 Provide at least one through and one left turn lanes open in each direction of travel for other work <br /> C Road may be closed completely for false work erection/removal and concrete pour or <br /> provide at least one through and one left turn lanes open in each direction of travel for other work <br /> REMARKS: <br /> 1. See Lane Closure Restriction for Designated Legal Holidays and Special Days table in Maintain Traffic o <br /> these special provisions for additional closure restrictions. <br /> thin the <br /> t of <br /> Pedestrian access facilities shall be provided n�i . Pedestrian walkways hallough cnruction areas tbe surfacedhw with <br /> way as shown on the plans and as specified he <br /> hot mix asphalt, portland cement concrete or timber. oneeachas de of pedesall be t anlwalkwaysand ras <br /> of irregularities. Hand railings shall be provided <br /> m hazards due to construction operations or adjacent <br /> necessary to protect pedestrian traffic fro <br /> vehicular traffic. Protective overhead covering shall be provided as necessary to insure <br /> protection from falling objects and drip from overhead structures. <br /> In addition to the requiredpenings through falsework, pedestrian facilities shall be provided <br /> during pile driving, footing, wall, and other bridge construction operations. At least one <br /> o <br /> walkway shall be available at all times. If the Contractor's operations require the closure of one <br /> walkway,then another walkway shall be provided nearby, off the traveled roadway. <br /> Railings shall be constructed of wood, S4S, and shall be painted white. Railings and <br /> walkways shall be maintained in good condition. Walkways shall be kept clear of obstructions. <br /> Full compensation for providing pedestrian facilities shall be considered as included in the <br /> prices paid for the various contract items of work involved and no additional compensation will <br /> be allowed therefor. <br /> locations where falsework openings arerequired <br /> traffic <br /> lalln <br /> Erection and removal of falsework at rk erection and removal, p <br /> be undertaken one location at a time. During falsewo <br /> the lanes over which falsework is being erected or removed shall be detoured or stopped as <br /> specified in this section, Maintaining Traffic." Falsework erection shall include adjustments or <br /> removal of components that contribute to the horizontal stability of the falsework system. <br /> Falsework removal shall include lowering falsework, blowing sand from sand jacks, turning <br /> screws on screw jacks, and removing wedges. <br /> The Contractor shall have necessary materials and equipment on the site to erect or remove <br /> the falsework in any one span or over any one opening before detouring or stopping public <br /> traffic. <br /> City Project No.09-11 134 <br />
The URL can be used to link to this page
Your browser does not support the video tag.