Laserfiche WebLink
10/04/2011 11:22 20945401 y5 [CAL 4,!ATEF,' PAGE 03/03 <br /> d,5 3 q -4- >--o t GL' <br /> 1, RIGHT OF WAY(ERDGE OF PAVEMENT, FACE 6F CURB,E'rc.) <br /> 2, CENTER LINE (EDGE OF PAVEMENT,ENT,.FACE OF CURB,ETC,) <br /> 3, OUR FACILITIES To NEAREST EDGE <br /> 4,STREET CUT TO CLOSEST X-STREET <br /> 3�°+ <br /> T <br /> 6v \ ra'T-0 L <br /> ra ex.cavation,aonstrur-4aon, andlor othervAse encroachment will take place on Highway Right-of-Way on the <br /> side Of (�w s-r'&L-' approximately ���� as Ile <br /> E_ �,r of; �1� 0.d n -A <br />