My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2011_PS-1102000 thru PS-1102500_ - PS-1102314
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2011
>
PS-1102000 thru PS-1102500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2011_PS-1102000 thru PS-1102500_ - PS-1102314
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:57:47 PM
Creation date
12/30/2015 12:13:57 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1102314
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2011\PS-1102000 thru PS-1102500
Year2
2011
Supplemental fields
Applicant
GRANITE CONSTRUCTION
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
BOTH SIDES OF HAMMER LN. AT THE INTERSECTION OF PE
Primary Parcel
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GRAnITE"" <br /> October 4, 2011, 2011 <br /> From: Granite Construction Company <br /> 10500 South Harlan Road <br /> French Camp, CA 95231 <br /> RE: 2010-2011 Street Overlay Project, City of Stockton Public Works O & M <br /> Mr. Scott Cooper, <br /> The City of Stockton has contracted with Granite Construction to perform an Asphalt concrete <br /> overlay project on Hammer Lane and California Streets. The following describes the project <br /> limits and the work to be performed. <br /> Proiect Limits: <br /> Hammer Lane from Kelly Drive to West Lane <br /> California Street from Alpine Ave to Wyandotte Street <br /> Description of Work: <br /> Our work includes deep grinding &patching (6-8") for base failures, wedge and conform <br /> grinding the existing paving to prepare the surface for a rubberized asphalt concrete overlay. In <br /> addition, new handicap ramps will be reconstructed at Misty Way and Amber Lane. New signal <br /> loop detectors will be installed at signalized intersections then finally striped for project <br /> completion. <br /> Hammer lane and California streets will be narrowed to one traffic lane for several hours during <br /> various stages of the project with temporary traffic control delineation. <br /> Mechanical malfunctions and unforeseen weather conditions may affect construction scheduling. <br /> If this occurs, it may be necessary to amend project duration and completion date. The project is <br /> scheduled to begin on October 3, 2011 and complete on November 24, 2011. Work hours are 8 <br /> AM to 4 PM daily. The portion within San Joaquin County is tentatively scheduled to begin on <br /> October 19, 2011 and complete on November 24, 2011. ih���� un !�/v��Aoz IS' fav <br /> If you require additional information or have questions please contact me at any time by phone <br /> or email. <br /> Thank you for your cooperation, <br /> Rick Little <br /> Cell: (916) 217-5318 <br /> Email: rick.little@gcinc.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.