My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2011_PS-1102501 thru PS-1103000_ - PS-1102604
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2011
>
PS-1102501 thru PS-1103000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2011_PS-1102501 thru PS-1103000_ - PS-1102604
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:58:19 PM
Creation date
12/30/2015 12:17:31 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1102604
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2011\PS-1102501 thru PS-1103000
Year2
2011
Supplemental fields
Applicant
Central Valley Telecom
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
FILBERT ST, AND FREMONT ST.
Owners
Parcel Address
WEST LN., SANGUINETTI LN., ROBINDALE AVE.,
Primary Parcel
Type (2)
PS-1102604
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SPECIAL CONDITIONS FOR <br /> ENCROACHMENT PERMIT <br /> 1. Maintain traffic controls for all roads. Traffic control delays shall not exceed 15 minutes. <br /> Two-way traffic shall be maintained during non-working hours with excavated areas backfilled or <br /> plated. During working hours, two-way traffic control shall be maintained with one lane open and <br /> appropriate flaggers. <br /> 2. Access to all properties shall be maintained at all times except when work is occurring at the <br /> access point. Minimal delays will be allowed to provide access within the work zone area. <br /> Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br /> contractor shall be replaced with in-kind or better materials. <br /> 3. Residents and businesses shall be notified in writing, as approved by the County, 48-hours in <br /> advance of any impacts to their access. <br /> 4. No open trench cutting allowed within the County right-of-way. Boring allowed only. <br /> 5. The owner shall be responsible for any and all costs associated with the relocation and/or <br /> adjustment of these facilities as determined by the County at the owner's expense. (Streets and <br /> Highways Code 1463) <br /> 6. All future maintenance of the pipeline and related facilities within the County right-of-way will <br /> require a San Joaquin County Encroachment Permit. <br /> 7. Contractor shall establish existing roadway and drainage grades within the construction area. <br /> Any repair to roadways and adjacent areas shall match existing grades. Any proposed grade <br /> changes shall receive prior approval from County. <br /> 8. Shoulder backing shall be backed with Class II Aggregate Base from edge of pavement a <br /> minimum of 4-inches thick by 4-foot wide. <br /> 9. School buses shall be passed through the work zone with minimal delays. <br /> 10. County roads shall be kept clean from mud and debris at all times along the access points and <br /> work zone areas during entire project. All standard roadway striping and signage shall be clearly <br /> visible, maintained and restored throughout the construction zone during and after the project. <br /> 11. In addition to standard dust control measures, streets shall be maintained in a clean condition, <br /> free of dirt, mud and debris during construction activities. The contractor shall provide daily, or as <br /> needed, street sweeping using a modern mechanical or vacuum-assisted street sweeper. <br /> 12. The contractor shall not conduct construction operations in rain or heavy fog conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.