My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2011_PS-1102501 thru PS-1103000_ - PS-1102851
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2011
>
PS-1102501 thru PS-1103000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2011_PS-1102501 thru PS-1103000_ - PS-1102851
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:58:46 PM
Creation date
12/30/2015 1:42:12 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1102851
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2011\PS-1102501 thru PS-1103000
Year2
2011
Supplemental fields
Applicant
CVIN, LLC
Contracts
CrossReference
Description
Encroachment Permit
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
Mc Henry Rd ,French Camp Rd, Austin Rd, Arch Rd,
Primary Parcel
Type (2)
PS-1102851
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PS-1102851 1-25-2012 <br /> SPECIAL CONDITIONS FOR <br /> CVIN - SEGMENT 17 <br /> ENCROACHMENT PERMIT <br /> 1. The conduit alignment shall be placed no closer than six (6) feet from the edge of pavement. <br /> 2. Minimum compaction in unpaved areas shall be 90%. <br /> 3. Compaction tests will be required for each day of trenching and shall be taken at locations as <br /> directed by the County Public Works inspector/field engineer. <br /> 4. The fiber optic cable is proposed to cross state and/or locally regulated channels at several <br /> locations. These crossings will require permits from the State (Central Valley Flood Protection <br /> Board - CVFPB) and/or San Joaquin County Flood Management Division - SJCFMD <br /> (Watercourse Encroachment Permit and/or Endorsement Letter). <br /> Required permits for each of the proposed crossings: <br /> • Lone Tree Creek— (State Permit from CVFPB and an Endorsement Letter from SJCFMD) <br /> • South Branch of South Littlejohn's Creek— (State Permit from CVFPB and an Endorsement <br /> Letter from SJCFMD) <br /> • North Branch of South Littlejohn's Creek— (State Permit from CVFPB and an Endorsement <br /> Letter from SJCFMD) <br /> • Duck Creek— (State Permit from CVFPB and an Endorsement Letter from SJCFMD) <br /> CVIN shall apply directly to the Central Valley Flood Protection Board for the state permits, but <br /> first submit a copy of the application(s) directly to the San Joaquin County Flood Management <br /> Division for the associated Endorsement Letter(s) (one for each crossing). The CVFPB will not <br /> issue their permit(s) without first receiving SJCFMD Endorsement Letter(s). In addition, the <br /> applicant must apply directly to the SJCFMD for the required Watercourse Encroachment <br /> Permit(s). Fees for each item apply; per current San Joaquin County Public Works Fee <br /> Schedule. <br /> "No work shall occur within 30 feet of the top of bank or 30 feet from the landside toe of the levee <br /> (where a levee exists) until such time all required State and County permits are obtained as <br /> confirmed by the Flood Management Division of the San Joaquin County Dept. of Public Works <br /> (Phone: 209-468-3605)." <br /> 5. Maintain traffic controls for all roads. Traffic control delays shall not exceed 15 minutes. <br /> Two-way traffic shall be maintained during non-working hours with excavated areas backfilled or <br /> plated. During working hours, two-way traffic control shall be maintained with one lane open and <br /> appropriate flaggers. <br /> 6. Access to all properties shall be maintained at all times except when work is occurring at the <br /> access point. Minimal delays will be allowed to provide access within the work zone area. <br /> Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br /> contractor shall be replaced with in-kind or better materials. <br />
The URL can be used to link to this page
Your browser does not support the video tag.