My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2011_PS-1103001 thru PS-1103500_ - PS-1103057
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2011
>
PS-1103001 thru PS-1103500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2011_PS-1103001 thru PS-1103500_ - PS-1103057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:58:58 PM
Creation date
12/30/2015 12:40:06 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1103057
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2011\PS-1103001 thru PS-1103500
Year2
2011
Supplemental fields
Applicant
JOHN FUKANO
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
STATE OF CA-CALTRANS
Parcel Address
S/S OF LOCKE RD@ INTERSECTION OF HWY 88
Primary Parcel
Type (2)
PS-11003057
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
State of California Business,Transportation and Housing Agency <br /> DEPARTMENT OF TRANSPORTATION <br /> December 8, 2011 <br /> Mr. Scott Cooper <br /> County of San Joaquin <br /> Department of Public Works <br /> Encroachment Permits '' <br /> 1810 E. Hazelton Ave. <br /> Stockton, CA 95205 <br /> Dear Mr. Cooper, <br /> Caltrans would like to reapply for an Encroachment Permit for our truck turn widening project <br /> at the Route 88/Locke Road intersection. In February 2008, Permit No. PS-0800652 (copy <br /> enclosed) was issued for this project(Kim Puccinelli was the Project Engineer). Unfortunately, <br /> the parcel acquisition was not completed in order to construct the project at that time. The <br /> parcel acquisition has finally been completed and I have been informed that funding is available <br /> to construct this project. <br /> Kim Puccinelli has since left state service so I have taken over her duties as the Project Design <br /> Engineer. The scope of the project is the same as before: sawcut the asphalt concrete slightly <br /> inside the edge of traveled way, excavate unwanted material as necessary and widening the <br /> pavement on the southwest quadrant of the Locke Road/Route 88 intersection. The widening <br /> will better accommodate large trucks making the right turn movement from eastbound Locke <br /> Road to westbound Route 88. The depth of asphalt concrete for the widening will be 0.55'. <br /> Also included is a lane closure chart and the project plans. <br /> Please contact me at (209) 948-7205 or email me at: John Fukanokdot.ca.gov if there are any <br /> questions or if additional information is required. <br /> Sincerely, <br /> John Fukano Project Engineer <br /> Caltrans, District 10 (Stockton) <br /> Traffic Engineering <br /> Email: John Fukanogdot.ca.gov <br /> (209) 948-7205 <br />
The URL can be used to link to this page
Your browser does not support the video tag.