Laserfiche WebLink
Traffic Control Plan <br /> Woodbridge Irrigation District <br /> Woodbridge Irrigation District staff intends on installing a kneel down curb <br /> on the Lower Sacramento Rd. bridge that crosses the WID main canal 20' <br /> downstream of the WID Fish Screen. This construction entrance is <br /> necessary for the operation and maintenance of our Fish Screen facility. <br /> The work performed will take approximately 2 days. <br /> The first day will be used to demo out the existing concrete, compact <br /> subgrade, and lay #5 rebar at 16" O.C. <br /> The second day we will pour concrete and should be done with the <br /> modification before the close of business. <br /> The traffic control plan will be to place cones and `Men at Work' signs on <br /> both sides of the street. The construction will not enter the street. Signage <br /> will be laid out as per SJCO specs. <br /> The site will have a USA locate done in the construction zone prior to any <br /> work being performed. <br /> For any questions or concerns please contact John Wookey @ (209)570-5971 <br /> or Anders Christensen @ (209)570-5914 —I` <br />