Laserfiche WebLink
COUNTY OF SAN JOAQUIN <br /> r' {� <br /> DEPARTMENT OF PUBLIC WORKS <br /> P.O.BOX 1810-1810 E. HAZELTON AVENUE Permit No: PS-1202385 <br /> STOCKTON,CALIFORNIA 95201 Date Issued: 12/11/2012 <br /> Fo <br /> -_ (209)468-3000 Exp. Date: 12/11/2013 <br /> FAX#(209)468-9324 <br /> Project No: PWPI10005 <br /> APN No: 26511006 <br /> DRIVEWAY ENCROACHMENT PERMIT <br /> To: FOSTER FARMS, LLC/VITALINA MIRANDA <br /> P.O.BOX 457 <br /> LIVINGSTON,CA 95334 <br /> Location: 5175 W. GAFFERY RD.;N/S OF GAFFERY RD. 1800'E/O HWY 580 <br /> In compliance with your request of ,and subject to all the terms,conditions and restrictions written below or printed as general or special <br /> provisions on any part of this form. <br /> Permission is hereby granted to construct One driveway w/o pipe shown on <br /> Pen-nit Application No.PS-1202385 Quad: SW <br /> Jobsite shall be kept in a safe condition at all times by removing daily any excess dirt or debris which might be a hazard to pedestrian <br /> and/or vehicular traffic. Adequate lights,signs and barricades shall be placed and maintained by <br /> the Permittee for the protection of the <br /> public in accordance with the current Caltrans Standard Specifications. <br /> A(n)(SEE STAMP) inside diameter per section 62 of the current Caltrans Standard Specifications,ALTERNATIVE PIPE AND PIPE <br /> ARCH CULVERTS,shall be installed in roadside drainage ditch for drainage flow maintenance and shall be of sufficient length to clear <br /> toe of approach fill or headwalls. <br /> The entire area of driveway approach(es), include flares for turning and/or paved frontage(s),from the edge of roadway pavement to <br /> right-of-way(front property)line shall be surfaced with a two inch(2")minimum of asphalt concrete over a(4 inch) minimum of <br /> compacted layer of three-quarter inch(3/4")maximum size aggregate base material(road gravel)conforming to Class 2 Aggregate Base <br /> specified in Section 26 of the current Caltrans Standard Specification,or with a four inch(4")minimum of portland cement concrete. <br /> If portland cement concrete pavement is installed,expansion joints shall be provided at the edge of pavement and along property line. <br /> Surface grades of approach(es)and/or to open ends of pipe. No ponding or puddles on pavement surface shall be allowed. <br /> The field Engineering Division of this office shall receive no less than forty-eight(48)hours notice prior to beginning of any work <br /> within the County right-of-way. After completion of the work permitted herein,all debris,lumber,barricades or any excess <br /> material shall be removed and the jobsite left in a neat workmanlike condition. The Permittee shall fill out and mail notice of <br /> completion provided by Grantor. <br /> Driveway(s) shall be complete prior to occupancy of the residence, <br /> but not to exceed expiration date. <br /> THOMAS GAU,Director <br /> Department f Public Works <br /> No pipe is required under and across driveway By lam <br /> P P 9 5 Isermit tion <br /> FORMS: SS/WW,R-17 I approach at this time. However,if in the future s <br /> it is determined by the County that pipe will be <br /> required at this location,it shall be the responsi- <br /> bility of the property owner to supply needed <br /> pipe per County requirements, <br />