My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2012_PS-1200001 thru PS-1200500_ - PS-12-00104
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2012
>
PS-1200001 thru PS-1200500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2012_PS-1200001 thru PS-1200500_ - PS-12-00104
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:59:27 PM
Creation date
12/30/2015 1:31:33 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-12-00104
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2012\PS-1200001 thru PS-1200500
Year2
2012
Supplemental fields
Applicant
WOODBRIDGE IRRIGATION DISTRICT
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
TRENCH
Owners
Parcel Address
BOTH SIDES OF DAVIS RD. 2,400 N/O WOODBRIGE RD.
Primary Parcel
Type (2)
PS-1200104
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Davis Road Pipe Replacement Project <br /> Project Description <br /> Proposed Date of Work: 1-18-2012 <br /> The Woodbridge Irrigation District in cooperation with the County plan to repair the <br /> pipeline serving Todd Maley's drip system on January 18, 2012 in a one day road <br /> closure. The District will file a no-fee encroachment permit, excavate and install the <br /> pipeline, backfill with CDF with high percent of calcium to within 3 inches of the top of <br /> pavement (TOP). The excavation shall be one foot wider on each side than the trench <br /> cut. The County will provide road closure signage, black top and resurface the road. <br /> The goal is install the pipe across Davis road as quickly as possible and within the <br /> allowed one day road closure. The road shall be saw cut prior to the work. WID will <br /> remove and recycle all spoil materials. All materials needed to do the job including pipe <br /> and fittings will be stockpiled at the site before the beginning of the operation. <br /> The contact name at Woodbridge Irrigation District for coordination of the repair and <br /> installation of the pipe is Andy Christensen, Manager <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.