Laserfiche WebLink
Davis Road Pipe Replacement Project <br /> Project Description <br /> Proposed Date of Work: 1-18-2012 <br /> The Woodbridge Irrigation District in cooperation with the County plan to repair the <br /> pipeline serving Todd Maley's drip system on January 18, 2012 in a one day road <br /> closure. The District will file a no-fee encroachment permit, excavate and install the <br /> pipeline, backfill with CDF with high percent of calcium to within 3 inches of the top of <br /> pavement (TOP). The excavation shall be one foot wider on each side than the trench <br /> cut. The County will provide road closure signage, black top and resurface the road. <br /> The goal is install the pipe across Davis road as quickly as possible and within the <br /> allowed one day road closure. The road shall be saw cut prior to the work. WID will <br /> remove and recycle all spoil materials. All materials needed to do the job including pipe <br /> and fittings will be stockpiled at the site before the beginning of the operation. <br /> The contact name at Woodbridge Irrigation District for coordination of the repair and <br /> installation of the pipe is Andy Christensen, Manager <br /> I <br />