My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2012_PS-1200001 thru PS-1200500_ - PS-12-00234 (2)
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2012
>
PS-1200001 thru PS-1200500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2012_PS-1200001 thru PS-1200500_ - PS-12-00234 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:00:11 PM
Creation date
12/30/2015 1:39:14 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-12-00234 (2)
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2012\PS-1200001 thru PS-1200500
Year2
2012
Supplemental fields
Applicant
RENEE WEAVER / PG&E
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
BELL HOLES TRENCH
Owners
Parcel Address
E/S OF HENRY RD. AT HALL RD. TO 650 S/O LEE RD.
Primary Parcel
Type (2)
PS-12-00234
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Special Conditions for -2- <br /> ENCROACHMENT PERMIT <br /> 12. Contractor shall establish existing roadway and drainage grades within the construction area. <br /> Any repair to roadways and adjacent areas shall match existing grades. Any proposed grade <br /> changes shall receive prior approval from County. <br /> 13. Disturbed shoulder edge shall be backed with Class II Aggregate Base from edge of pavement a <br /> minimum of 4-inches thick by 4-foot wide. <br /> 14. School buses shall be passed through the work zone with minimal delays. <br /> 15. Above ground boxes and other similar facilities will be allowed within the right-of-way if located as <br /> far to the outside edge as possible and if the location either meets AASHTO Clear Zone <br /> guidelines or is protected by an existing obstruction such as a tree or utility pole. Utility vaults <br /> shall be located a minimum of 4'-0" from edge of pavement. <br /> 16. County roads shall be kept clean from mud and debris at all times along the access points and <br /> work zone areas during entire project. All standard roadway striping and signage shall be clearly <br /> visible, maintained and restored throughout the construction zone during and after the project. <br /> 17. In addition to standard dust control measures, streets shall be maintained in a clean condition, <br /> free of dirt, mud and debris during construction activities. The contractor shall provide daily, or as <br /> needed, street sweeping using a modern mechanical or vacuum-assisted street sweeper. <br /> 18. The contractor shall not conduct construction operations in rain or heavy fog conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.