My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2012_PS-1200001 thru PS-1200500_ - PS-12-00290
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2012
>
PS-1200001 thru PS-1200500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2012_PS-1200001 thru PS-1200500_ - PS-12-00290
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:00:29 PM
Creation date
12/30/2015 1:42:49 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-12-00290
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2012\PS-1200001 thru PS-1200500
Year2
2012
Supplemental fields
Applicant
PG&E NICK HALE
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
S/S TURNER RD. 1845' E/O DAVIS RD.
Primary Parcel
Type (2)
PS-12-00290
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ENCROACHMENT PERMIT , <br /> 1. This GENERAL PROVISIONS _ <br /> permit is issued under and subject to all l <br /> following"references: aws and ordinances of agencies governing the encroachment herein permitted.See the <br /> STREETS AND HIGHWAYS CODE <br /> L Division 1,Chapter 3 <br /> 2.Division 2,Chapter 2,Section 942 <br /> 3.Divisijn 2,Chapter 4,Section 1126 <br /> 4.Division 2,Chapter 6 J <br /> SAN JOAQUIN COUNTY ORDINANCES NUMBERED:324.44 1; <br /> 648.662,672,695,700,860,and 892. <br /> 2. It is understood and agreed by the Permittee that the doing of any work under this permit shall constitute an'acceptance of all the <br /> P �- <br /> provisions contained herein and failure on the Permittee's part to comply with any provision will us cause far revocation of this <br /> Except otherwise provided for public agencies and franchise holders,this permit is revocable on five days notice. <br /> 3• All work shall be done subject to the supervisicsn of and the satisfaction of the . <br /> progress of the work keep the County Hi grantor. The Permittee shall at all times during the <br /> ty gway in as neat and clean a condition as is possible and uon completion:of the work - <br /> ranted herein,shall Leave the County Highway in a thoroughly neat,clean P <br /> gand usable condition. <br /> 4.' The 1?ftm ittee also agrees by the acceptance of this permit to properly <br /> -$ay,part of the Conn Hi wa and to immediate) p t Y maintain auy encroachment structure placed by the Permittee on <br /> County Y y repair any injury any portion of the highway,which occurs as a result of the_ <br /> Mairriahntenance of the said encroachment structure,until such time as the Permittee maybe relieved of the responsibility of such <br /> nttenance of the encroachment structure by the County of San Joaquin. <br /> 5. The Permittee also agrees by the acceptance of this <br /> permit to make,at its own expense, such repairs as may be deemed necessary by <br /> flue Googly Director of Public Works or his representative. . <br /> 6. It is further agreed by the Permittee that whenever construction,reconstruction or mai <br /> the installation provided for herein shall,upon request of the County °mom work upon the-highway may require, <br /> the sole expense of the Permittee. ti °ty Department of Public Works,be immediately moved by and at . <br /> --No material used-for fill or backfill in the construction of the encroachment shall be <br /> Way. borrowed 6r taken from within the County right of <br /> 8. Aff work shall be planned and carried out so-that there willbeas little iacoavenieace as' <br /> shall be stacked within eight feet(8�of the a of the possible to the traveling public. No material <br /> �$ pavement or traveled way unless otherwise provided herein Adequate <br /> provision shall be made for the.protection of the traveling public. Barricades steall be placed,With approved Signs and lights at light, <br /> and flagmen shall be employed,A as may be required by the particular work in <br /> progress- <br /> .9. Tlie Permittee,by the acceptance of this <br /> propertypermit,shall assume full responsibility for all liability for personal injury or damage to <br /> y arise out of the work herein permitted or which may arise out of the failure of the part of the Permittee to do the <br /> work provided for under this permit. In the event any.claim of such liability is made <br /> department,official ore to ee thereo the Permittee shall def � the County of San Joaquin or any <br /> daim. Y enc),indemnify,and hold them and each of them harmless for such <br /> � ll backfill Material is to bq�,moistened as necessary-and thoroughly co <br /> Director of Public W th with mechanical means:If-required by the County <br /> orks,such backfill shall consist of vel or crushed rock.The Permittee shall maintain the <br /> structrn�es placed hereunder as may be surface over . <br /> - of such responsibility by the y Y insure the return the roadway to a completely Stable condition and until relieved <br /> Y> rtment of Public Works.Wherever a gravel,crushed rock or <br /> damaged in the work of placing.an encroachment strurdure,such shall either be °g is cut or <br /> 'Asncady as possible in its.ori i separately stored and replaced in the roadway <br /> genal state or shall be replaced in land,and ore roadway ndition as It <br /> Shall be left in at least as good a co <br /> was before the eommencemenf of operations of placing the encroachment strirctrw <br /> starting wodc.Vihewvcrmc•pessary to.secure permission Rom abutting property owners,such authority must be secured by the Perini <br /> rte,Vrior to <br /> 12. Tire future safety and convenience of the traveling public shall be given every consideration in the location and type of construction. <br /> . tin. <br /> ars " - <br />
The URL can be used to link to this page
Your browser does not support the video tag.