My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2012_PS-1200501 thru PS-1201000_ - PS-12-00557
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2012
>
PS-1200501 thru PS-1201000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2012_PS-1200501 thru PS-1201000_ - PS-12-00557
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:01:58 PM
Creation date
12/30/2015 2:59:44 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-12-00557
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2012\PS-1200501 thru PS-1201000
Year2
2012
Supplemental fields
Applicant
PACIFIC GAS & ELECTRIC
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
N/S OF SANTA FE RD. 145' E/O REILE AVE.
Primary Parcel
Type (2)
PS-1200557
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SPECIAL CONDITIONS FOR <br /> PG&E - SANTA FE RD. - PM 30851945 <br /> ENCROACHMENT PERMIT <br /> 1. Maintain traffic controls for all roads. Traffic control delays shall not exceed 15 minutes. <br /> Two-way traffic shall be maintained during non-working hours with excavated areas backfilled or <br /> plated. During working hours, two-way traffic control shall be maintained with one lane open and <br /> appropriate flaggers. <br /> 2. No working between the hours of 6:00 a.m. to 8:00 a.m. and 4:00 p.m. to 6:00 p.m. <br /> 3. Access to all properties shall be maintained at all times except when work is occurring at the <br /> access point. Minimal delays will be allowed to provide access within the work zone area. <br /> Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br /> contractor shall be replaced with in-kind or better materials. <br /> 4. Residents and businesses; shall be notified of the work schedule in writing, as approved by the <br /> County, 48-hours in advance of any impacts to their access. <br /> 5. Any areas where parking is to be restricted shall have signs noticing the time period placed at <br /> least 48 hours in advance of the work. <br /> 6. No trench cutting in the asphalt of Santa Fe Road, within the county portion. Santa Fe Road was <br /> resurfaced in 2011. <br /> 7. Contractor shall switch to bore method, if during trenching there is any chance of contact with the <br /> asphalt. <br /> 8. The contractor shall use Sian Joaquin County Standard R-29 when backfilling trenches within the <br /> County right-of-way. PG&E shall repair any damaged pavement using the same materials as <br /> currently in place. <br /> 9. All pipe and pipeline related facilities including, but not limited to, valves, utility boxes and vaults, <br /> and frames and covers shall be maintained by PG&E. PG&E shall be responsible for any and all <br /> costs associated with the relocation and/or adjustment of these facilities as determined by the <br /> County at PG&E's expense. (Streets and Highways Code 1463) <br /> 10. All future maintenance of the pipeline and related facilities within the County right-of-way will <br /> require a San Joaquin County Encroachment Permit. <br /> 11. Length of open, unbackfilled trench shall be limited to a total maximum length of 250 linear feet <br /> during working hours. <br /> 12. Trenches shall be maintained in a smooth and even condition to the satisfaction of the County <br /> throughout the project limits at all times. <br /> 13. All trenches shall be completely backfilled or shored and plated at the end of each workday, and <br /> the roadway restored to two-way traffic. If plating is to be used, a trench shoring and plating plan <br /> suitable for traffic loadings shall be prepared by a registered civil engineer and submitted for prior <br /> approval by the County. <br />
The URL can be used to link to this page
Your browser does not support the video tag.