ITI, REPAIRS OF THE COUNTY RIGHT OF WAY:
<br /> A All excavations shall be backfilled and "COMPacted' i
<br /> ly after-work therein has been completed, mediate_
<br /> B. Trenches shall. not be left open farther than. 300 feet in
<br /> advance of pipe laying operations, or-200 feet' to the rear thereof,
<br /> T. -unless otherwise permitted by the Engineer.
<br /> C.. Unless otherwise
<br /> that the' relll be' placed andrmechanicallyr Compapctedainpsuchsaomanner
<br /> that the' relative' compaction throughout the entire fill
<br /> County road right of way 'shall conform to• within the
<br /> tion as stated below. the •percentages•of comp4c-
<br /> 1. The relative. compaction from the. bottom• of,excavation to
<br /> a plane five feet (5 ) below. original surface
<br /> than eighty per cent (8016)', •as determined by Test .Methodrade S lNobeCalifarnia.
<br /> no less
<br /> 216-C of the Materials and Research Department,. State of California,
<br /> Department of Public Works, Division of Highways, dated January 3,
<br /> 1956. ,.
<br /> 2. - The relative compaction from. a plan'q, five feet
<br /> 'the ,original -surface grade to said original-surface (59 :below
<br /> less;than.ninety.pce cent gr.ade•.shall be no
<br /> method, (9�}, as determined,by the above .testing
<br /> D.' Ning.o='po'rtion 'of'the excavation(s) .
<br /> or Jettshall be compacted by ponding
<br /> E. All pavements, curbs '
<br /> Pipes, headwalls, road signs,' gutters sidewalks, borrow ditches,
<br /> road facilities •impaired' or-asea�resultbofyconsaructioneoperations
<br /> Permanent
<br /> at the construction site(s ,'�'or..at other-ground(s) occupied pe
<br /> materials. and/or.equipment,. shall be restored immediately upon back-
<br /> by
<br /> filling of the. excavation to -the, original ed
<br /> and cross sections,
<br /> and to a condition as good as, or better .than existed prior, to 'the
<br /> construction,
<br /> Fr All surfacing.materials of roadways and driveway approaches
<br /> cut or: damaged.by..or as a .result of construction operations, shall be.
<br /> replaced within ONE WEEK following the backfilling of excavation,
<br /> weather permitting, with compacted layers of' surfacing materials at
<br /> least as �thick''as the existin ' '
<br /> g," and no less' than two inches•(2") .of
<br /> asphalt concrete. over six inchee:(6"} of , both ds ,
<br /> specified'b.elow. aggregate base
<br /> 1• Asphalt Concrete: Combined mineral aggregate ,shall''con-
<br /> ..form. to the quald ty and..
<br /> ..gradation 1/2" gradation requirements for Type "B" one-half
<br /> Section } max- aggregate, medium 'gradation, as specified' in
<br /> 39 of the California Standard Specifications dated January
<br /> 1960, The 'bituminous binder to be 'Mixed ationsmineral"aggregate. shall
<br /> be paving asphalt having a penetration range of. 85-100; unless other-
<br /> wise directed by the Engineer,
<br /> in cases where approved by the En sneer, a suitable
<br /> cold�laid'asph'alt concrete mixture ("cut-back" may be used in place
<br /> of the 'above specified asphalt- concrete..
<br /> Placement of asphalt concrete surfacing 'shall conform to
<br /> "tpe ifications provisions of Seotion 39 of the California Standard
<br /> Specifications.
<br /> .: form to 'the quality anAggregate Base: Combined mineral aggregate shall con-
<br /> d the grading for three-quarter inch (3/4")
<br /> maximum•size aggregate .- 'Class, 2 Aggregate.:Base specified in Section
<br /> 26 of the California Standard�'Specifications' dated January 1960,
<br /> G. Before acceptance of repairs to the County road rights of
<br /> -r;•way,` all .unsightly and detrimental, dirt, dust and/or debris 'shall be
<br /> removed and the `construction area(s)` left in. (a'). neat and presentable
<br /> condation(s).
<br /> 1, If. necessary, County; r.oad traveled way and.driveway , .
<br /> pavements shall be washed with water :to remove dirt and. dust.
<br /> 2. Driveway approaches and field- entrance pavements 'damaged
<br /> by equipment or spoil banks- shall be repaired' •as directed by-the.:
<br /> Engineer. .
<br /> H. Upon request by the County, any settlement; sagging of .sur-
<br /> _face, or cracking of pavement shall be repaired immediatel b
<br /> the sole expense of the Permittee for a perio_c�. of mediy y and at.
<br /> following the acceptance of reninety {9C) days
<br /> pairs to the County- rights of way,
<br /> Form SS (Revised 1163.).*.
<br />
|