Laserfiche WebLink
ITI, REPAIRS OF THE COUNTY RIGHT OF WAY: <br /> A All excavations shall be backfilled and "COMPacted' i <br /> ly after-work therein has been completed, mediate_ <br /> B. Trenches shall. not be left open farther than. 300 feet in <br /> advance of pipe laying operations, or-200 feet' to the rear thereof, <br /> T. -unless otherwise permitted by the Engineer. <br /> C.. Unless otherwise <br /> that the' relll be' placed andrmechanicallyr Compapctedainpsuchsaomanner <br /> that the' relative' compaction throughout the entire fill <br /> County road right of way 'shall conform to• within the <br /> tion as stated below. the •percentages•of comp4c- <br /> 1. The relative. compaction from the. bottom• of,excavation to <br /> a plane five feet (5 ) below. original surface <br /> than eighty per cent (8016)', •as determined by Test .Methodrade S lNobeCalifarnia. <br /> no less <br /> 216-C of the Materials and Research Department,. State of California, <br /> Department of Public Works, Division of Highways, dated January 3, <br /> 1956. ,. <br /> 2. - The relative compaction from. a plan'q, five feet <br /> 'the ,original -surface grade to said original-surface (59 :below <br /> less;than.ninety.pce cent gr.ade•.shall be no <br /> method, (9�}, as determined,by the above .testing <br /> D.' Ning.o='po'rtion 'of'the excavation(s) . <br /> or Jettshall be compacted by ponding <br /> E. All pavements, curbs ' <br /> Pipes, headwalls, road signs,' gutters sidewalks, borrow ditches, <br /> road facilities •impaired' or-asea�resultbofyconsaructioneoperations <br /> Permanent <br /> at the construction site(s ,'�'or..at other-ground(s) occupied pe <br /> materials. and/or.equipment,. shall be restored immediately upon back- <br /> by <br /> filling of the. excavation to -the, original ed <br /> and cross sections, <br /> and to a condition as good as, or better .than existed prior, to 'the <br /> construction, <br /> Fr All surfacing.materials of roadways and driveway approaches <br /> cut or: damaged.by..or as a .result of construction operations, shall be. <br /> replaced within ONE WEEK following the backfilling of excavation, <br /> weather permitting, with compacted layers of' surfacing materials at <br /> least as �thick''as the existin ' ' <br /> g," and no less' than two inches•(2") .of <br /> asphalt concrete. over six inchee:(6"} of , both ds , <br /> specified'b.elow. aggregate base <br /> 1• Asphalt Concrete: Combined mineral aggregate ,shall''con- <br /> ..form. to the quald ty and.. <br /> ..gradation 1/2" gradation requirements for Type "B" one-half <br /> Section } max- aggregate, medium 'gradation, as specified' in <br /> 39 of the California Standard Specifications dated January <br /> 1960, The 'bituminous binder to be 'Mixed ationsmineral"aggregate. shall <br /> be paving asphalt having a penetration range of. 85-100; unless other- <br /> wise directed by the Engineer, <br /> in cases where approved by the En sneer, a suitable <br /> cold�laid'asph'alt concrete mixture ("cut-back" may be used in place <br /> of the 'above specified asphalt- concrete.. <br /> Placement of asphalt concrete surfacing 'shall conform to <br /> "tpe ifications provisions of Seotion 39 of the California Standard <br /> Specifications. <br /> .: form to 'the quality anAggregate Base: Combined mineral aggregate shall con- <br /> d the grading for three-quarter inch (3/4") <br /> maximum•size aggregate .- 'Class, 2 Aggregate.:Base specified in Section <br /> 26 of the California Standard�'Specifications' dated January 1960, <br /> G. Before acceptance of repairs to the County road rights of <br /> -r;•way,` all .unsightly and detrimental, dirt, dust and/or debris 'shall be <br /> removed and the `construction area(s)` left in. (a'). neat and presentable <br /> condation(s). <br /> 1, If. necessary, County; r.oad traveled way and.driveway , . <br /> pavements shall be washed with water :to remove dirt and. dust. <br /> 2. Driveway approaches and field- entrance pavements 'damaged <br /> by equipment or spoil banks- shall be repaired' •as directed by-the.: <br /> Engineer. . <br /> H. Upon request by the County, any settlement; sagging of .sur- <br /> _face, or cracking of pavement shall be repaired immediatel b <br /> the sole expense of the Permittee for a perio_c�. of mediy y and at. <br /> following the acceptance of reninety {9C) days <br /> pairs to the County- rights of way, <br /> Form SS (Revised 1163.).*. <br />