Laserfiche WebLink
PS-1200726 <br /> April 9,2012 <br /> SPECIAL CONDITIONS FOR <br /> ENCROACHMENT PERMIT <br /> 1. Access to all properties shall be maintained at all times except when work is occurring at the <br /> access point. Minimal delays will be allowed to provide access within the work zone area. <br /> Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br /> contractor shall be replaced with in-kind or better materials. <br /> 2. Residents and businesses shall be notified in writing, as approved by the County, 48-hours in <br /> advance of any impacts to their access. <br /> 3. Emergency responder access to effected residences shall be maintained at all times. <br /> 4. Any areas where parking is to be restricted shall have signs noticing the time period placed at <br /> least 48 hours in advance of the work. <br /> 5. Existing fences shall not be removed without written consent signed by the property owner and <br /> submitted to the County prior to the removal. Fences removed shall be restored with in-kind or <br /> better materials at the edge of the right-of-way. <br /> 6. All pipe and pipeline related facilities including, but not limited to, valves, utility boxes and vaults, <br /> and frames and covers shall be maintained by the Permittee. The Permittee shall be responsible <br /> for any and all costs associated with the removal, relocation and/or adjustment of these facilities <br /> as determined by the County at the Permittee's expense. (Streets and Highways Code 1463) <br /> 7. All future maintenance of the pipeline and related facilities within the County right-of-way will <br /> require a San Joaquin County Encroachment Permit. <br /> 8. Pipeline shall be on a straight grade a minimum of 30" below ditches or toe of embankment slope. <br /> 9. Markers are to be set at the County right-of-way line (property line) on both sides of Perrin Rd. <br /> Identifying the location of the pipeline crossing and the name of the contact person. <br /> 10. Contractor shall establish existing roadway and drainage grades within the construction area. <br /> Any repair to roadways and adjacent areas shall match existing grades. Any proposed grade <br /> changes shall receive prior approval from County. <br /> 11. Applicant is required to enter into an agreement with San Joaquin County Public Works providing <br /> for maintenances of the section above the pipeline. The obligations and covenants contained with <br /> the agreement shall run with the land. <br />