Laserfiche WebLink
{ A <br /> C O N S T R U C T 1 O N <br /> 11555 Dublin Boulevard <br /> P.O.Box 2909 <br /> Dublin,California 94568-2909 <br /> 925/829-9220 <br /> www.desilvagates.com <br /> CONTRACTORS LICENSE NO.704195 A <br /> May 15,2012 <br /> CEMEX Construction Materials Pacific,LLC <br /> 30350 S.Tracy Blvd. <br /> Tracy,CA 95377 <br /> Attn: Mr. Gordon Brown <br /> Re: Tracy Blvd. Pavement Repair <br /> Kerlinger Aggregate Quarry,Tracy,CA <br /> DGC Estimate No. 1205029 <br /> Dear Gordon, <br /> tion,this <br /> DeSilva Gates Construction is pleased repairs°o��''rracyit rBlvd. from theview ►northern limit of the existing <br /> to perform the roadway pavement <br /> bridge to the driveway into the current pit being excavated by CEMEX. The scope of work is <br /> detailed below: <br /> 1. Pulverize the existing roadway pavement and regrade and compact the pulverized <br /> materials in place to be utilized as the base for the new pavement. <br /> 2. Remove pulverized material to allow fora 100' long taper to conform to the existing <br /> pavement surface at each conform. <br /> 3, Furnish and place a new 5"AC sw•face over the graded and compacted pulverized <br /> base material. The AC will be placed in two lifts. The base lilt will be 3"with <br /> AC. Th top lift will be 2"with ''/z" AC. Tack Oil will be applied between the lifts. <br /> 4. Back up the new AC edge with pulverized material generated from the regrading of <br /> the existingroadway. <br /> 5. Replace existing striping and markers with Thermoplastic striping and markers to <br /> match the existing. <br /> 6. We exclude Prime Oil on the regraded pulverized base prior to placing the new AC <br /> pavement. <br /> 7. The roadway will remain open to traffic during the pulverizing and pavement work. <br /> We will provide flagmen to allow one way, reversing traffic control during the actual <br /> work hours. During iron-working hours,the traffic will utilize the regraded <br /> pulverized base until the new AC pavement is placed. <br /> 8. We include construction area signs and delineation as necessary for the safety of the <br /> public using Tracy Blvd.during construction. <br /> 9. All work is to be completed in one move-in. <br /> 10. AC Paving price is based on a liquid asphalt rack price of$675.00 per ton. Any <br /> increase or decrease in the rack price at the time of having will result in an increase <br /> or decrease in the AC Paving price at the rate of$0.60/ton for each $10.00 change in <br /> the rack price. <br />