PS-1201978 June 4, 2013 <br /> SPECIAL CONDITIONS FOR <br /> MACARTHUR DRIVE - 790068 <br /> ENCROACHMENT PERMIT <br /> 1. Maintain traffic controls for all roads. Traffic control delays shall not exceed 15 minutes. <br /> Two-way traffic shall be maintained during non-working hours with excavated areas backfilled or <br /> plated. During working hours, local traffic, emergency and delivery vehicles shall have access <br /> provided at all times. <br /> 2. Access to all properties shall be maintained at all times except when work is occurring at the <br /> access point. Minimal delays will be allowed to provide access within the work zone area. <br /> Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br /> contractor shall be replaced with in-kind or better materials. <br /> 3. Residents and businesses shall be notified in writing, as approved by the County, 48-hours in <br /> advance of any impacts to their access. <br /> 4. Existing fences shall not be removed without written consent signed by the property owner and <br /> submitted to the County prior to the removal. Fences removed shall be restored with in-kind or <br /> better materials at the edge of the right-of-way. <br /> 5. Final paving for road resurfacing shall be per approved improvement plans which are <br /> incorporated as part of this permit, and shall not occur between November 1 and March 31, <br /> unless authorized by the County. <br /> 6. All pavement markings destroyed or obliterated must be replaced in kind by the permittee. Typical <br /> pavement markings include, but not limited to, lane lines, centerlines, stop and stop ahead <br /> legends, limit lines, raised pavement markers and miscellaneous delineators. <br /> 7. The permittee is responsible for any Survey Monuments disturbed by this project and shall file a <br /> corner record to reestablish them using a Licensed Land Surveyor. <br /> 8. No paving joints allowed within paved shoulder, contractor shall pave all the way to outer edge of <br /> paved shoulder. <br /> 9. Contractor shall establish existing roadway and drainage grades within the construction area. <br /> Any repair to roadways and adjacent areas shall match existing grades. Any proposed grade <br /> changes shall receive prior approval from County. <br /> 10. Shoulder backing shall be backed with Class II Aggregate Base from edge of pavement a <br /> minimum of 4-inches thick by 4-foot wide. <br /> 11. County roads shall be kept clean from mud and debris at all times along the access points and <br /> work zone areas during entire project. All standard roadway striping and signage shall be clearly <br /> visible, maintained and restored throughout the construction zone during and after the project. <br /> 12. In addition to standard dust control measures, streets shall be maintained in a clean condition, <br /> free of dirt, mud and debris during construction activities. The contractor shall provide daily, or as <br /> needed, street sweeping using a modern mechanical or vacuum-assisted street sweeper. <br />