My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2012_PS-1201501 thru PS-1202000_ - PS-1201992
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2012
>
PS-1201501 thru PS-1202000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2012_PS-1201501 thru PS-1202000_ - PS-1201992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:08:30 PM
Creation date
12/30/2015 4:11:11 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1201992
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2012\PS-1201501 thru PS-1202000
Year2
2012
Supplemental fields
Applicant
ADVANCED GEO ENVIRONMENTAL INC.
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
BOTH SIDES OF START ST. 500' S/O HWY 12
Primary Parcel
Type (2)
PS-1201992
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
24 July 2012 <br /> AGE-NC Project No. 10-1801 <br /> Page 5 of 5 <br /> equipped and 8.25-inch hollow stem augers. Prior to well destruction, each well casing will <br /> be sounded with a Solinst water level meter to ensure that no obstructions are present in <br /> the casings. Thereafter, the drill rig hoist will be utilized to remove each monitoring well box <br /> steel ring. <br /> Monitoring wells MW-4A, MW-7A and MW-20A shall be attempted to be destroyed by <br /> connecting a cable to the top of the well casing and removing the entire well casing and <br /> cement seal with the drill rig hoist. Thereafter, the well casing/cement seal void space will <br /> be backfilled utilizing portland type II grout. A ratio of three gallons water for every <br /> 50-pound sack of portland cement will be utilized in preparation of the grout mixture. Each <br /> well will be completely backfilled to surface grade with the portland cement grout mixture. <br /> Soil cuttings generated during the popsicle method well abandonment activities will be <br /> containerized in a 10-yard soil bin and temporarily stored at the Flag City Shell site for <br /> future disposal to a Class III landfill (i.e. Forward Landfill). <br /> 3.4. WELL DESTRUCTION REPORTING <br /> Following the completion of the proposed scope of work, a well destruction report will be <br /> prepared. The report will include a description of the work performed and will document the <br /> disposal of all well materials, soil cuttings and rinseate. The report will be in a format <br /> acceptable to the SJCEHID and the CVRWQCB guidelines, and will be reviewed and <br /> signed by a California Professional Geologist. <br /> Advanced GeoEnviron mental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.