My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2012_PS-1202001 thru PS-1202500_ - PS-12-02130 (4)
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2012
>
PS-1202001 thru PS-1202500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2012_PS-1202001 thru PS-1202500_ - PS-12-02130 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:08:51 PM
Creation date
12/30/2015 4:15:39 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-12-02130 (4)
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2012\PS-1202001 thru PS-1202500
Year2
2012
Supplemental fields
Applicant
PACIFIC GAS & ELECTRIC- WALNUT CK.
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
S/S OF TURNER RD. BETWEEN UPRR & LODI CITY LIMITS
Primary Parcel
Type (2)
PS-12-02130
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-2- <br /> Special Conditions for <br /> ENCROACHMENT PERMIT <br /> 13. Disturbed shoulder edge shall be backed with Class II Aggregate Base from edge of pavement a <br /> minimum of 4-inches thick by 6-foot wide. <br /> 14. School buses shall be passed through the work zone with minimal delays.right-of-way <br /> - a if located as <br /> n the <br /> Above ground boxes and other similar facilitieslocationeithermeets ed IAASHTO Clear Zone s <br /> 15. ossible and if the ole. Utility vault <br /> far to the outside edge as p <br /> guidelines or is protected by an existing obstruction such as a tree or utility p <br /> shall be located a minimum of 4'-0" from edge of pavement. <br /> nts <br /> 16. County roads <br /> shall be kept clean from mud and debris at all timesalong�and shall poi be clearand ly <br /> work zone areas during entire protect. All standard roadway striping <br /> visible, maintained and restored throughout the construction zone during and after the project. <br /> l be <br /> in a clean condition, <br /> 17. In addition to standard dust conng construction activities. <br /> The contractortrol measures, streets sdshall provide daily, or as <br /> free of dirt, mud and debris duri <br /> needed, street sweeping using a modern mechanical or vacuum-assisted street sweeper. <br /> 18. The contractor shall not conduct construction operations in rain or heavy fog conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.