Laserfiche WebLink
O <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />Col <br />8 <br />9 <br />Const-AECO <br />Limits of Clearing and Grubbing and Mailbox Relocation fr'• <br />2' 2' <br />EP ' EP <br />2' 2' , o . <br />9.5' 9.5' <br />441' (Typ.) 1' 17' Geosynthetic Pavement Interlayer Var <br />TE <br />Paving Fabric) <br />Match Match <br />8% Exist Slope I Exist Slope <br />Vogr- ('o far— - <br />Conform t Existing Roadway Conform <br />Variable Depth Shoulder 2:1 Max0.17' HMA Overlay <br />Backing (Typ) <br />TYPICAL SECTION Earthwork (See Sheet 6 <br />Grade Existing Shoulder <br />to Tapered Edge, q1'3 for locations) <br />place Castle <br />TE <br />Road: Sta 10+12 to Sta <br />T^ 4^ ' '' 12-(L-T , <br />1' minimum width (Typ) will be a (oy l'O0 LT placed at Ske 4e9 a a i:e 1) <br />See Sheet 4 for 89+72 to 90+72 Typical Section <br />GENERAL NOTES: <br />0.17' HMA Overlay must be placed in one (1) layer over Geosynthetic Pavement Interlayer <br />Paving Fabric) on the existing prepared surface. <br />Core data is unavailable; however, anticipate varying layers of base and roadway surfacing <br />materials within the sectional planing depth of the existing roadway. <br />Placement of HMA Overlay must not begin until the HMA used in Pavement Repair has <br />been in place for a minimum of 18 hours. <br />Existing highway and utility facilities must remain in place unless otherwise noted. <br />Existing trees, shrubs, fences, mailboxes and other frontage improvements must remain in <br />place unless otherwise noted. <br />Existing drainage facilities must remain in place unless otherwise noted. The Contractor <br />must conduct earthwork operations so as not to modify or obstruct the existing drainage. <br />All Earthwork, except for final shoulder grading, must be completed prior to placing the <br />final layer of HMA pavement. No Shoulder Backing material will be deposited or drifted on <br />the final layer of HMA surfacing. Where the shoulder placement exceeds 0.50' in <br />thickness, the Shoulder Backing must be placed in two (2) or more fully compacted <br />layers. <br />Shoulder Backing material at all locations shown must receive Penetration Treatment at <br />0.25 gallon/square yard. Limits of the Penetration Treatment work must be confined to <br />limits shown at 4' width. <br />The Contractor will be responsible for adequately scheduling inspection and testing of all <br />facilities constructed under this contract with a minimum 24 hour prior notice to the <br />County. All testing must conform to the Standard Specifications. All re -testing will be paid <br />by the Contractor. <br />COUNTY OF SAN JOAQUIN I NO SCALE <br />DRAWN BY DATE PROJ ENGINEER DATE <br />J Verstl 04/2021 <br />e ao ix W*% <br />10. Hand grinding of AC pavement will be required at locations where existing highway and <br />utility facilities are within the Cold Plane Pavement and Pavement Repair limits. Payment <br />for hand grinding will be considered as included in the contract unit price paid for Cold <br />Plane Pavement. <br />11. The Contractor must obtain all permits and licenses required for the construction and <br />completion of the project, and must perform all work in accordance with the <br />requirements and conditions of all permits and approvals applicable to the project. <br />12. The Contractor must exercise due caution and carefully preserve survey bench marks, <br />control points, reference points and all survey stakes, and must bear all expenses for <br />replacement and/or errors caused by their unnecessary loss or disturbance. <br />13. Prior to commencing any work, it will be the Contractor's responsibility to have each <br />utility company locate in the field their main service lines and laterals. The Contractor <br />must notify members of the Underground Service Alert (USA) 48 hours in advance of <br />performing excavation work by calling the toll free number (1-800-642-2444) or 811. <br />14. The Contractor must field verify all existing highway and utility facilities' locations and <br />depths. It will be the Contractor's sole responsibility to locate and protect all existing <br />highway and utility facilities, so that no damage results to them during the performance <br />of this contract. The Contractor will be required to cooperate with other contractors and <br />utility companies installing new structures, utilities and services to the project. Payment <br />for this work will be considered to be included in the various items of work. <br />TYPICAL SECTION AND <br />GENERAL NOTES <br />CHECKED I DATE <br />x^.te- IY <br />CASTLE ROAD RESURFACING Sheet No. <br />Northland Road to 55' South of French Camp Road) 1 2 of 6