My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP7322 - SP7326
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP6718 - SP7507
>
SP7322 - SP7326
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 11:28:22 AM
Creation date
10/27/2021 10:44:41 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Seidner Avenue Resurfacing
Limits
State Route 120 to Kelly Road
Year
2021
Project Engineer
Anthony Felix
Roads Worked
Seidner Avenue
Red Lines
Yes
Project #
221951
Districts
District 4
Supplemental fields
Classification
Record Drawings
Cross Ref
SP7322-SP7326
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-o <br />0 <br />D <br />rrn <br />_T1 <br />r <br />m <br />z <br />0 <br />0.5 — <br />Va i <br />Conform TE <br />Variable Depth <br />Shoulder Backing (Typ) <br />GENERAL NOTES: <br />f <br />CO/!St <br />—Limits of Clearing and Grubbing and mailbox relocation. - <br />1 <br />19' <br />18' Geosynthetic Pavement Interlayer Fabric (Paving Fabric) <br />Match Exist Slope <br />0.25' HMA Overlay I <br />TYPICAL SECTION <br />Sta 11+45 to Sta 80+70 <br />Match Exist Slope <br />Exist Roadway <br />y <br />1. 0.25' HMA Overlay must be placed in two (2) layers of approximately equal thickness with Geosynthetic Pavement Interlayer (Paving Fabric) placed between the layers. Placement of <br />HMA Overlay must not begin until the HMA used in Pavement Repair has been in place for a minimum of 18 hours. <br />2. Core data is unavailable; however, anticipate varying layers of base and roadway surfacing materials within the sectional planing depth of the existing roadway surface. <br />3. Placement of HMA Driveways must not begin until the HMA used for Mainline Paving has been completed. <br />4. Existing highway and utility facilities must remain in place unless otherwise noted. <br />5. Existing trees, shrubs, fences, mailboxes and other frontage improvements must remain in place unless otherwise noted. <br />6. Existing drainage facilities must remain in place unless otherwise noted. The Contractor must conduct earthwork operations so as not to modify or obstruct the existing drainage. <br />7. All Earthwork, except for final shoulder grading, must be completed prior to placing the final layer of HMA Pavement. No Shoulder Backing material will be deposited or drifted on the <br />final layer of HMA surfacing. Where the shoulder placement exceeds 0.50' in thickness, the Shoulder Backing must be placed in two (2) or more fully compacted layers. <br />8. The Contractor will be responsible for adequately scheduling inspection and testing of all facilities constructed under this contract with a minimum 24 hour prior notice to the County. <br />All testing must conform to the Standard Specifications. All re—testing will be paid by the Contractor. <br />9. Prior to commencing any work, it will be the Contractor's responsibility to have each utility company locate in the field their main service lines and laterals. The Contractor must <br />notify members if the Underground Service Alert (U.S.A.) 48 hours in advance of performing excavation work by calling the toll free number (1-800-642-2444) or 811 . <br />10. The Contractor must exercise due caution and carefully preserve survey bench marks, control points, reference points and all survey stakes, and must bear all expenses for <br />replacement and/or errors caused by their unnecessary loss or disturbance. <br />11. The Contractor must field verify all existing highway and utility facilities' locations and depths. It will be the Contractor's sole responsibility to locate and protect all existing <br />highway and utility facilities, so that no damage results to them during the performance of this contract. The Contractor will be required to cooperate with other <br />contractors and utilities and services to the project. Payment for this work will be considered to be included in the various items of work. <br />COUNTY <br />OF <br />SAN JOAQUIN <br />NO SCALE <br />TYPICAL SECTION AND SEIDNER AVENUE RESURFACING Sheet No. <br />GENERAL NOTES (State Route 120 to Kelly Road) 2 of 5 <br />DRAWN BY <br />DATE <br />PROJECT ENGINEER DATE <br />CHECKED <br />DATE <br />A.TeCix <br />01/2021 <br />111k. <br />1-t3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.