My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP7322 - SP7326
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP6718 - SP7507
>
SP7322 - SP7326
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 11:28:22 AM
Creation date
10/27/2021 10:44:41 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Seidner Avenue Resurfacing
Limits
State Route 120 to Kelly Road
Year
2021
Project Engineer
Anthony Felix
Roads Worked
Seidner Avenue
Red Lines
Yes
Project #
221951
Districts
District 4
Supplemental fields
Classification
Record Drawings
Cross Ref
SP7322-SP7326
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
W <br />tN <br />1 <br />SHOULDER BACKING <br />Location Quantity (TON) <br />Sta 11 +45 to Sta 80+70 (Lt & Rt) Total 842 <br />EARTHWORK <br />(MISCELLANEOUS AREAS) <br />Location <br />Quantity (STA) <br />Ste -330© 34+39 1.30 <br />Sta 33+00 (Rt) to <br />Sta 34+30 (Rt) 1.30 <br />Sta 46+50—(U -to <br />Sta 47+00 (Lt) ----------,50 <br />Sta 54+00 --(LI) -to <br />Sta 54+00 (Rt) to <br />Sta 55 -*25 (Lt� <br />Sta 0 (Rt) Sok 3.66.� <br />Sta 74+75 (Rt) <br />25 (Rt�— =A .50 <br />Sta 80+70 <br />Total 7.85,,°..%0 <br />DRIVEWAY (TYPE D) <br />Location Quantity (SQYD) <br />34 Locations Total 807 <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PROJECT ENGINEER DATE <br />A. (Fek 01/2021 2-1-512,1 <br />DRIVEWAY (TYPE E) <br />Location Quantity (SQYD) <br />+2 Locations Total 335 <br />HOT <br />MIX ASPHALT <br />(TYPE A) <br />Location <br />Quantity <br />(TON) <br />Mainline Paving <br />Sta 11 +45 to <br />Sta 80+70 <br />2,768 <br />Driveway (Type <br />D) <br />34 Locations <br />161 <br />Driveway (Tvae <br />E)E) <br />12 Locations <br />32 <br />Pavement Repair <br />Locations to be determined <br />by Engineer <br />17 <br />Total <br />2,978 <br />NO SCALE <br />CHECKED <br />-01-- � �55C----5 <br />SUMMARY OF QUANTITIES <br />DATE <br />-"(3 /Zr <br />GEOSYNTHETIC PAVEMENT INTERLAYER <br />(PAVING FABRIC) <br />Location Quantity (SQYD) <br />Sta 11 +95 to Sta 80+20 Total 13,850 <br />COLD PLANE PAVEMENT <br />Location Quantity (SQYD) <br />Seidner Avenue Road <br />Sta 11+45 to Sta 11+95 <br />Sta 80+20 to Sta 80+70 <br />Total <br />114 <br />107 <br />221 <br />PAVEMENT REPAIR <br />Location Quantity (SQYD) <br />Throughout Project Limits Total 100 <br />mEGORP " <br />Goffsctions e�y GP/ r ►n.C. <br />No changes By . <br />- Date <br />PenOn Using This Drawing ffY <br />Alt 1114wmOtIon By In4wift Tiza ° tt <br />SEIDNER AVENUE RESURFACING <br />(State Route 120 to Kelly Road) <br />Sheet No. <br />5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.