Laserfiche WebLink
W <br />tN <br />1 <br />SHOULDER BACKING <br />Location Quantity (TON) <br />Sta 11 +45 to Sta 80+70 (Lt & Rt) Total 842 <br />EARTHWORK <br />(MISCELLANEOUS AREAS) <br />Location <br />Quantity (STA) <br />Ste -330© 34+39 1.30 <br />Sta 33+00 (Rt) to <br />Sta 34+30 (Rt) 1.30 <br />Sta 46+50—(U -to <br />Sta 47+00 (Lt) ----------,50 <br />Sta 54+00 --(LI) -to <br />Sta 54+00 (Rt) to <br />Sta 55 -*25 (Lt� <br />Sta 0 (Rt) Sok 3.66.� <br />Sta 74+75 (Rt) <br />25 (Rt�— =A .50 <br />Sta 80+70 <br />Total 7.85,,°..%0 <br />DRIVEWAY (TYPE D) <br />Location Quantity (SQYD) <br />34 Locations Total 807 <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PROJECT ENGINEER DATE <br />A. (Fek 01/2021 2-1-512,1 <br />DRIVEWAY (TYPE E) <br />Location Quantity (SQYD) <br />+2 Locations Total 335 <br />HOT <br />MIX ASPHALT <br />(TYPE A) <br />Location <br />Quantity <br />(TON) <br />Mainline Paving <br />Sta 11 +45 to <br />Sta 80+70 <br />2,768 <br />Driveway (Type <br />D) <br />34 Locations <br />161 <br />Driveway (Tvae <br />E)E) <br />12 Locations <br />32 <br />Pavement Repair <br />Locations to be determined <br />by Engineer <br />17 <br />Total <br />2,978 <br />NO SCALE <br />CHECKED <br />-01-- � �55C----5 <br />SUMMARY OF QUANTITIES <br />DATE <br />-"(3 /Zr <br />GEOSYNTHETIC PAVEMENT INTERLAYER <br />(PAVING FABRIC) <br />Location Quantity (SQYD) <br />Sta 11 +95 to Sta 80+20 Total 13,850 <br />COLD PLANE PAVEMENT <br />Location Quantity (SQYD) <br />Seidner Avenue Road <br />Sta 11+45 to Sta 11+95 <br />Sta 80+20 to Sta 80+70 <br />Total <br />114 <br />107 <br />221 <br />PAVEMENT REPAIR <br />Location Quantity (SQYD) <br />Throughout Project Limits Total 100 <br />mEGORP " <br />Goffsctions e�y GP/ r ►n.C. <br />No changes By . <br />- Date <br />PenOn Using This Drawing ffY <br />Alt 1114wmOtIon By In4wift Tiza ° tt <br />SEIDNER AVENUE RESURFACING <br />(State Route 120 to Kelly Road) <br />Sheet No. <br />5 of 5 <br />