My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2012_PS-1202001 thru PS-1202500_ - PS-12-02367
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2012
>
PS-1202001 thru PS-1202500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2012_PS-1202001 thru PS-1202500_ - PS-12-02367
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:09:39 PM
Creation date
12/30/2015 4:21:20 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-12-02367
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2012\PS-1202001 thru PS-1202500
Year2
2012
Supplemental fields
Applicant
PACIFIC GAS & ELECTRIC - STOCKTON
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
S/S OF DANA AVE. 20' E/O CARDINAL AVE.
Primary Parcel
Type (2)
PS-12-02367
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PS-1202367 October 3,2012 <br /> SPECIAL CONDITIONS FOR <br /> PG&E — DANA AVE. — PM 30881208 <br /> ENCROACHMENT PERMIT <br /> 1. Maintain traffic controls for all roads. Traffic control delays shall not exceed 15 minutes. <br /> Two-way traffic shall be maintained during non-working hours with excavated areas backfilled or <br /> plated. During working hours, two-way traffic control shall be maintained with one lane open and <br /> appropriate flaggers. <br /> 2. Access to all properties shall be maintained at all times except when work is occurring at the <br /> access point. Minimal delays will be allowed to provide access within the work zone area. <br /> Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br /> contractor shall be replaced with in-kind or better materials. <br /> 3. Residents and businesses shall be notified in writing, as approved by the County, 48-hours in <br /> advance of any impacts to their access. <br /> 4. Any areas where parking is to be restricted shall have signs noticing the time period placed at <br /> least 48 hours in advance of the work. <br /> 5. No trench cutting of County roads shall occur between November 1 and March 31 without prior <br /> authorization by the County. <br /> 6. All pavement markings destroyed or obliterated must be replaced in kind by the permittee. Typical <br /> pavement markings include, but not limited to, lane lines, centerlines, stop and stop ahead <br /> legends, limit lines, raised pavement markers and miscellaneous delineators. <br /> 7. The permittee is responsible for Survey Monuments disturbed by trenching and is required to file <br /> a corner record and to reestablish them using a Licensed Land Surveyor after the trench <br /> restoration in completed. <br /> 8. Final paving for trench repair or road resurfacing shall be per Caltrans' specifications and shall <br /> not occur between November 1 and March 31 unless authorized by the County. <br /> 9. All pipe and pipeline related facilities including, but not limited to, valves, utility boxes and vaults, <br /> and frames and covers shall be maintained by Pacific Gas & Electric (PG&E). PG&E shall be <br /> responsible for any and all costs associated with the removal, relocation and/or adjustment of <br /> these facilities as determined by the County at PG&E's expense. (Streets and Highways Code <br /> 1463) <br /> 10. All future maintenance of the pipeline and related facilities within the County right-of-way will <br /> require a San Joaquin County Encroachment Permit. <br /> 11. All trenches/bore pits shall be completely backfilled or shored and plated at the end of each <br /> workday, and the roadway restored to two-way traffic. If plating is to be used, a trench shoring <br /> and plating plan suitable for traffic loadings shall be prepared by a registered civil engineer and <br /> submitted for prior approval by the County. <br />
The URL can be used to link to this page
Your browser does not support the video tag.