My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2012_PS-1202501 thru PS-1203000_ - PS-12-02533
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2012
>
PS-1202501 thru PS-1203000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2012_PS-1202501 thru PS-1203000_ - PS-12-02533
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:10:21 PM
Creation date
12/30/2015 4:27:38 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-12-02533
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2012\PS-1202501 thru PS-1203000
Year2
2012
Supplemental fields
Applicant
CALIFORNIA WATER SERVICE
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
ST. RT 99 WIDENING @ FARMINGTON RD.
Primary Parcel
Type (2)
PS-12-02533
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� f <br /> Special Conditions for -3- <br /> ENCROACHMENT PERMIT <br /> 24. In addition to standard dust control measures, streets shall be maintained in a clean condition, <br /> free of dirt, mud and debris during construction activities. The contractor shall provide daily, or as <br /> needed, street sweeping using a modern mechanical or vacuum-assisted street sweeper. <br /> 25. The contractor shall not conduct construction operations in rain or heavy fog conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.