Laserfiche WebLink
t <br /> NOTES: <br /> 1. If the distance between cross—cuts are less then 150' the entire EXHIBIT 2 <br /> between cross cuts shall be planed and resurfaced with one (1) inch of <br /> Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard <br /> Drawing No. R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs <br /> within the shoulder or lane, only that area shall be resurfaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a <br /> Seal Coat for that half of the roadway containing the trench can be used in <br /> lieu of resurfacing. Section 3910.3 (8-2). <br /> Q)-I- <br /> U� U <br /> Q � <br /> N O <br /> cU <br /> O O <br /> �-C 6 <br /> � Q <br /> Paved Shoulder <br /> x � Q <br /> Q) U'_ <br /> U O <br /> N <br /> W 1: <br /> W 0 U U <br /> 0 <br /> 0 <br /> �I � I <br /> 0 <br /> o, <br /> z <br /> II <br /> 01 , <br /> II w <br /> I , <br /> T <br /> CDJ <br /> 0 U <br /> O <br /> O <br /> U) <br /> O <br /> , L <br /> :_I U <br /> e Approved by- <br /> CROSS <br /> yCROSS CUTTING OF <br /> COUNTY ROADWAYS <br /> No Revision Deuxi on Date <br /> COUNT <br /> Y OF SAN JOAQUIN <br /> Worldng for YOU DEPARTMENT OF PUBLIC WORKS <br /> Drawn by:TRC Checked by: Date: 8/24/12 <br />