My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2012_PS-1202501 thru PS-1203000_ - PS-12-02848
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2012
>
PS-1202501 thru PS-1203000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2012_PS-1202501 thru PS-1203000_ - PS-12-02848
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:11:44 PM
Creation date
12/30/2015 5:17:26 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-12-02848
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2012\PS-1202501 thru PS-1203000
Year2
2012
Supplemental fields
Applicant
CVIN, LLC
Contracts
CrossReference
Description
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
BOTH SIDES OF MCHENRY AVE AT RIVER RD.
Primary Parcel
Type (2)
PS-12-02848
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Special Conditions for -2- <br /> ENCROACHMENT PERMIT <br /> 14. Trenches shall be maintained in a smooth and even condition to the satisfaction of the County <br /> throughout the project limits at all times. <br /> 15. All trenches shall be completely backfilled or shored and plated at the end of each workday, and <br /> the roadway restored to two-way traffic. If plating is to be used, a trench shoring and plating plan <br /> suitable for traffic loadings shall be prepared by a registered civil engineer and submitted for prior <br /> approval by the County. <br /> 16. The contractor shall use San Joaquin County Standard R-29 when backfilling trenches within the <br /> County right-of-way. Where the existing road structural section is below standard, a minimum <br /> section of 3 inches of asphalt concrete over 8 inches of aggregate base shall be required. <br /> 17. Temporary pavement shall be provided for all trench areas within three days of pavement <br /> removal or by Friday of each week, whichever is more restrictive. <br /> 18. Final trench paving shall be placed when the length of temporarily surfaced trench exceeds 1,500 <br /> linear feet or by segment of road as determined by the County. Final trench paving will also be <br /> required to be placed when interruptions or delays of the work exceed two (2) weeks. <br /> 19. Roadway areas subject to pavement cuts shall receive a 0.12-foot asphalt concrete overlay from <br /> the centerline (or lane line) to the edge of the traveled way. If the pavement is disturbed on both <br /> sides of the centerline (or adjacent lane), then the entire roadway (or affected lanes) shall be <br /> resurfaced. All pavement conforms shall be ground to provide a flush surface. Contractor shall <br /> grind and overlay within 10 working days of permanent trench paving. Shoulder areas shall be <br /> brought up to the finish grade as directed by the County. <br /> 20. No paving joints allowed within paved shoulder, contractor shall pave all the way to outer edge of <br /> paved shoulder. <br /> 21. Contractor shall establish existing roadway and drainage grades within the construction area. <br /> Any repair to roadways and adjacent areas shall match existing grades. Any proposed grade <br /> changes shall receive prior approval from County. <br /> 22. Any disturbance of existing shoulder shall be replaced or restored with shoulder backing backed <br /> with Class II Aggregate Base from edge of pavement a minimum of 4-inches thick by 6-foot wide; <br /> 95% relative compaction required within shoulder backing. <br /> 23. School buses shall be passed through the work zone with minimal delays. <br /> 24. Above ground vaults, pedestals or other similar facilities will be allowed within the right-of-way if <br /> located as far to the outside edge as possible and if the location either meets AASHTO Clear <br /> Zone guidelines or is protected by an existing obstruction such as a tree or utility pole. Utility <br /> vaults shall be located a minimum of 4'-0" from edge of pavement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.