My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2012_PS-1202501 thru PS-1203000_ - PS-1202838
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2012
>
PS-1202501 thru PS-1203000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2012_PS-1202501 thru PS-1203000_ - PS-1202838
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:11:39 PM
Creation date
12/30/2015 5:45:11 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1202838
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2012\PS-1202501 thru PS-1203000
Year2
2012
Supplemental fields
Applicant
Contracts
CrossReference
Description
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
Primary Parcel
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ao�Q Coco® Goc VC-2 <br /> * Stabilize roadway using aggregate, asphalt concrete, or concrete based on longevity, required <br /> performance, and site conditions. The use of cold mix asphalt or asphalt concrete(AC) <br /> grindings for stabilized construction roadway is not allowed. <br /> * Coordinate materials with those used for stabilized construction entrance/exit points. <br /> * If aggregate is selected,place crushed aggregate over geotextile fabric to at least 12 in. depth. <br /> A crushed aggregate greater than 3 in.but smaller than 6 in. should be used. <br /> Xnspection and Maintenance <br /> a Inspect and verify, that activity—based BMPs are in place prior to the commencement of <br /> associated activities. While activities associated with the BMP are under way,impact weekly <br /> during the rainy season and of two-week intervals in the non-rainy season to verify <br /> continued BMP implementation. <br /> a Keep all temporary roadway ditches clear. <br /> s When no longer required, remove stabilized construction roadway and re-grade and repair <br /> slopes. <br /> o Periodically apply additional aggregate on gravel roads. <br /> Ei Active dirt construction roads are commonly watered three or more times per day during the <br /> dry season. <br /> Costs <br /> Gravel construction roads are moderately expensive,but cost is often balanced by reductions in <br /> construction delay. No additional costs for dust control on construction.roads should be <br /> required above that needed to meet local air quality requirements. <br /> References <br /> Blueprint for a Clean Bay: Best Management Practices to Prevent Stormwater Pollutibn from <br /> Construction Related Activities; Santa Clara Valley Nonpoint Source Pollution Control Program, <br /> 1995• <br /> Coastal Nonpoint Pollution Control Program; Program Development and Approval Guidance, <br /> Working Group,Working Paper; USEPA,April 1992. <br /> Manual of Standards of Erosion and Sediment Control Measures,Association of Bay Area <br /> Governments,May 1995. <br /> Stormwater Quality Handbooks Construction Site Best Management Practices (BMPs)Manual, <br /> State of California Department of Transportation(Caltrans),November 2000. <br /> Stormwater Management for Construction Activities,Developing Pollution Prevention Plans <br /> and Best Management Practices, EPA 832-R-92005; USEPA,Apri11992. <br /> Stormwater Management of the Puget Sound Basin,Technical Manual, Publication#51-75, <br /> Washington State Department of Ecology, February 1992. <br /> january 2003 California Stormwater BMP Handbook <br /> 3 of 4 <br /> Construction <br /> www.cabrnphand books.corn <br />
The URL can be used to link to this page
Your browser does not support the video tag.