Laserfiche WebLink
GENERAL NOTES: <br />1. 0.25' HMA Overlay must be placed in two (2) layers of approximately equal <br />thickness with Geosynthetic Pavement Interlayer (Paving Fabric) placed on existing <br />or prepared roadway, unless noted otherwise. <br />2. Placement of HMA Overlay must not begin until the HMA used in Pavement Repair <br />has been in place for a minimum of 18 hours. <br />3. Placement of HMA Driveways must not begin until the HMA used for Mainline Paving <br />has been completed. <br />4. Existing highway and utility facilities must remain in place unless otherwise noted. <br />5. Existing trees, shrubs, fences, mailboxes and other frontage improvements must <br />remain in place unless otherwise noted. <br />6. All Earthwork, except for final shoulder grading, must be completed prior to placing <br />the final layer of HMA pavement. No Shoulder Backing material will be deposited or <br />drifted onto the final layer of HMA surfacing. Where the shoulder placement <br />exceeds 0.50' in thickness, the Shoulder Backing must be placed in two (2) or <br />more fully compacted layers. <br />7. Shoulder Backing material at all intersection radii must receive Penetration <br />Treatment at 0.25 gallon/square yard. Limits of the Penetration Treatment work <br />must be confined to intersection radii plus fifty feet (50') in each direction or to <br />the intersection conform. <br />q - <br />Const <br />8. The Contractor will be responsible for adequately scheduling inspection and testing <br />of all facilities constructed under this contract with a minimum 24 hour notice to <br />the County. All testing must conform to the Standard Specifications. All re—testing <br />will be paid by the Contractor. <br />9. The Contractor must exercise due caution and carefully preserve survey bench <br />marks, control points, reference points and all survey stakes, and must bear all <br />expenses for replacement and/or errors caused by their unnecessary loss or <br />disturbance. <br />10. Prior to commencing any work, it will be the Contractor's responsibility to have <br />each utility company locate in the field their main service lines and laterals. The <br />Contractor must notify members of the Underground Service Alert (U.S.A.) 48 hours <br />in advance of performing excavation work by calling the toll free number <br />(1-800-642-2444) or 811. <br />11. The Contractor must obtain an Encroachment Permit from Caltrans for traffic <br />control or any work within their jurisdiction. Payment for this will be considered as <br />included in contract prices paid for the various items of work included. <br />UPA%WiNG <br />-'em thkV nil* Dream Sh"M 1 ON# <br />R :: .x Ort{1sib11 Br InepwUng TIN 8lte Of Mie* <br />Limits of Clearing and Grubbing and Mailbox Relocation <br />1 ' 2' 2' 20'-22' <br />1 <br />19'-21' Geosynthetic Pavement Interlayer (Paving Fabric) <br />0.5 0.5 <br />---{ TE Match Match �/ TE <br />II8% o _Existing Slope Existing Slope 8% <br />71 777�2= <br />i%••ZZ <br />�� <br />W — — — — — — — — — — — — — —— ------———— — — — — — <br />I <br />Conform Conform <br />0.25 HMA Overlay Existing Roadway <br />cv Grade existing ground Variable Depth <br />�^ D to place TE Shoulder Backing T <br />m 1 min width (Typ) <br />TYPICAL SECTION g (yp) <br />m Van Allen Road: Sta 9+80 to Sta 113+92 <br />M <br />z <br />GENERAL NOTES AND VAN ALLEN ROAD RESURFACING Sheet No. <br />COUNTY OF SAN JOAQUIN NO SCALE TYPICAL SECTION (State Route 120 to Lone Tree Road) 2 of 5 <br />DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE <br />-Ton Curry OI�21 �� � _a . ?-l/�lz! !/7!2./ <br />