Laserfiche WebLink
NOTES: EXHIBIT 2 <br /> 1. If the distance between cross—cuts are less then 150' the entire area <br /> between cross—cuts shall be planed and resurfaced with one (1) inch of <br /> Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard <br /> Drawing No. R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs <br /> within the shoulder or lane, only that area shall be resurfaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a <br /> Seal Coat for that half of the roadway containing the trench can be used in <br /> lieu of resurfacing. Section 3910.3 (B-2). <br /> o <br /> Q) <br /> �. a) <br /> a C: <br /> � Q)U <br /> O <br /> co <br /> Paved Shoulder--�-►� 'x Q <br /> 0 4- <br /> Q) o <br /> W I I U U <br /> O <br /> 4 <br /> O <br /> r <br /> . I I <br /> I I I <br /> _j ( I <br /> z I I I <br /> I ' I Lil <br /> T_ .111AZ <br /> • I I I <br /> O <br /> M/// <br /> F4 <br /> O � � <br /> T- `-U <br /> O <br /> U) <br /> O <br /> _1U <br /> Approved by: <br /> CROSS CUTTING OF <br /> COUNTY ROADWAYS <br /> No Revision Dmwf on DcrEe <br /> COUNTY OF ►.SAlir JOAQUTV <br /> Working for. DEPA.RT1vIENT OF PUBLIC WORKS <br /> OCT Drawn by:TRC Checked <br /> by: Date: 8/24/12 <br />