Laserfiche WebLink
y 1,, <br /> NOTES: EXHIBIT 2 <br /> 1. If the distance between cross—cuts are less then 150' the entire area <br /> between cross—cuts shall be planed and resurfaced with one (1) inch of <br /> Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard <br /> Drawing No. R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs <br /> within the shoulder or lane, only that area shall be resurfaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a <br /> Seal Coat for that half of the roadway containing the trench can be used in <br /> lieu of resurfacing. Section 3910.3 (B-2). <br /> Q C: <br /> N O <br /> Cn O <br /> � Q <br /> Paved Shoulder— co <br /> x (D Q <br /> Q) 0 4-- <br /> Q O <br /> Q � <br /> CDS <br /> w ° Q <br /> _o <br /> 0 <br /> L <br /> �I I <br /> o <br /> f <br /> Z: I <br /> �I 1 <br /> 1 I W <br /> _o <br /> 4-1 <br /> o :3 <br /> 4--U <br /> O <br /> +, (n <br /> Cn <br /> O <br /> L_ <br /> 1 <br /> a CROSS CUTTING OF <br /> proved by: <br /> r COUNTY ROADWAYS <br /> ` No Revision Qnwicdon Date <br /> COU TY OF SAN JOA <br /> Q UIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> orldng for YOU Drown W.TRC lChecked <br /> by: Date: 8/24/12 <br />