Laserfiche WebLink
NOTES: EXHIBIT 2 <br /> 1. If the distance between cross—cuts are less then 150' the entire area <br /> between cross—cuts shall be planed and resurfaced with one (1) inch of <br /> Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard <br /> Drawing No. R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs <br /> within the shoulder or lane, only that area shall be resurfaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a <br /> Seal Coat for that half of the roadway containing the trench can be used in <br /> lieu of resurfacing. Section 3910.3 (B-2). <br /> 4-1 <br /> a� <br /> U� U <br /> . Q � <br /> CU <br /> � O <br /> Paved Shoulder--- � I 0 <br /> a`0 <br /> o — o <br /> W I I0 <br /> N U <br /> O <br /> O <br /> r- <br /> ON/ <br /> I ( I <br /> O I f <br /> zl I I <br /> �•I I I � <br /> ' I W <br /> 1 I I <br /> O <br /> .+.1 <br /> O � � <br /> — U <br /> C0 <br /> co <br /> O <br /> L <br /> I I J U <br /> I <br /> o <br /> CROSS <br /> R ApprovedOSS CUTTING OF <br /> �. COUNTY ROADWAYS <br /> RmiWon D� on Date <br /> `ryT COUNTY OF SAY JOAQUTV <br /> DEPARTMENT of PUBLIC WORKS <br /> Warldmg for YOU Drawn by:TRC Checked br. <br /> Date: 8/24/12 <br />