SPECIAL CONDITIONS FOR <br /> PG & E RELOCATION - HWY 99 PROJECT <br /> ENCROACHMENT PERMIT <br /> 1. Maintain traffic controls for all roads. Traffic control delays shall not exceed 15 minutes. <br /> Two-way traffic shall be maintained during non-working hours with excavated areas backfilled or <br /> plated. During working hours, two-way traffic control shall be maintained with one lane open and <br /> appropriate flaggers. <br /> 2. Access to all properties shall be maintained at all times except when work is occurring at the <br /> access point. Minimal delays will be allowed to provide access within the work zone area. <br /> Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br /> contractor shall be replaced with in-kind or better materials. <br /> 3. Residents and businesses shall be notified in writing, as approved by the County, 48-hours in <br /> advance of any impacts to their access. <br /> 4. Any areas where parking is to be restricted shall have signs noticing the time period placed at <br /> least 48 hours in advance of the work. <br /> 5. No trench cutting of County roads shall occur between November 1 and March 31 without prior <br /> authorization by the County. <br /> 6. All pavement markings destroyed or obliterated must be replaced in kind by the permittee. Typical <br /> pavement markings include, but not limited to, lane lines, centerlines, stop and stop ahead <br /> legends, limit lines, raised pavement markers and miscellaneous delineators. <br /> 7. The permittee is responsible for Survey Monuments disturbed by trenching and is required to file <br /> a corner record and to reestablish them using a Licensed Land Surveyor after the trench <br /> restoration in completed. <br /> 8. All pipe and pipeline related facilities including, but not limited to, valves, utility boxes and vaults, <br /> and frames and covers shall be maintained by PG & E. PG & E shall be responsible for any and <br /> all costs associated with the removal, relocation and/or adjustment of these facilities as <br /> determined by the County at PG & E's expense. (Streets and Highways Code 1463) <br /> 9. All future maintenance of the pipeline and related facilities within the County right=of-way will <br /> require a San Joaquin County Encroachment Permit. <br /> 10. Length of open, unbackfilled trench shall be limited to a total maximum length of 250 linear feet <br /> during working hours. <br /> 11. Trenches shall be maintained in a smooth and even condition to the satisfaction of the County <br /> throughout the project limits at all times. <br /> 12. All trenches shall be completely backfilled or shored and plated at the end of each workday, and <br /> the roadway restored to two-way.traffic. If plating is to be used, a trench shoring and plating plan <br /> suitable for traffic loadings shall be prepared by a registered civil engineer and submitted for prior <br /> approval by the County. <br />