My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2013_PS-1300001 thru PS-1300500_ - PS-1300308 (2)
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2013
>
PS-1300001 thru PS-1300500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2013_PS-1300001 thru PS-1300500_ - PS-1300308 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:13:42 PM
Creation date
12/30/2015 5:31:03 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1300308 (2)
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2013\PS-1300001 thru PS-1300500
Year2
2013
Supplemental fields
Applicant
APEX ENVIRONMENTAL, INC.
Contracts
CrossReference
Date Entered
6/10/2013
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
DESTRUCTION OF WATER MONITORING WELLS
Owners
Parcel Address
E/S OF 6TH STREET N/O "F" STREET
Primary Parcel
Type (2)
PS-1300308
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Scott Cooper <br /> From: Michael VanDenEnden <MikeV@ApexEnvirotech.com> <br /> Sent: Tuesday,January 29, 2013 10:53 AM <br /> To: Scott Cooper <br /> Subject: 5491 F Street, Banta, CA <br /> Scott, <br /> Per our phone conversation January 29,2013,you requested Apex detail how each well will be destroyed and how the <br /> road way will be repaired. <br /> The wells will be grouted using tremie pipe from the bottom of the well to the surface with Portland cement <br /> slurry. After the cement slurry has been placed in the wells,the well heads will be pressurized to 25 pounds per square <br /> inch gauge (psig)for a minimum of five minutes. Following pressure grouting activities,the top five feet of each well will <br /> be over-drilled and backfilled with the Portland cement slurry to within a foot of ground surface. Each borehole will be <br /> capped with soil to match the surrounding surfaces. <br /> Apex anticipates coordinating well destruction activities in the months of March or April of 2013. <br /> Michael van den Enden <br /> Project Geologist <br /> Apex Envirotech, Inc. <br /> 11244 Pyrites Way <br /> Gold River, CA <br /> 916-851-0174 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.