My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP7221 - SP7231
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP6718 - SP7507
>
SP7221 - SP7231
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 11:21:42 AM
Creation date
8/5/2022 3:22:08 PM
Metadata
Fields
Template:
Small Plans - SP
Project
El Dorado Street Resurfacing
Limits
Interstate 5 to Stockton City Limits
Year
2019
Project Engineer
Vincent Li
Roads Worked
El Dorado Street
Red Lines
Yes
Project #
221717
Federal #
STPL-5929(295)
Districts
District 1
Supplemental fields
Classification
Record Drawings
Cross Ref
SP7221-SP7231
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br />im <br />I0 <br />PORTABLE CHANGEABLE <br />MESSAGE SIGN <br />Location Quantity (EA) <br />EI Dorado St 2 <br />French Camp Rd 2 <br />Tota I : 4 <br />PLANING ROADWAY SURFACING <br />Location Quantity (SQYD <br />EL DORADO ST <br />Sta 9+20 to Sta 65+77 47,144 <br />(Includes French Camp Rd Intersection) <br />Sta 71 +10 to Sta 75+43 9 _ -in4 <br />Total : 49,453 <br />ROADWAY EXCAVATION <br />Location Quantity (CY) <br />Sta 65+77 to Sta 67+77 661 <br />Sto 69+10 to Sta 71 +10 690 <br />Total : 1,351 <br />Tota I : 6.77 <br />SHOULDER BACKING <br />Location Quantity (TON <br />Sta 65+77 to Sta 67+77 (Lt & Rt) 21 <br />Sta 69+10 to Sta 71+10 (Lt & Rt) 7 <br />Total : 28 <br />EARTHWORK <br />Location <br />(MISCELLANEOUS AREAS) <br />EL DORADO ST <br />Location <br />Quantity <br />(STA <br />Sta 65+77 <br />to Sta 67+77 (Lt) <br />2.00 <br />Sta 67+00 <br />to Sta 67+77 (Rt) <br />0.77 <br />Sta 69+10 <br />to Sta 71+10 (Lt) <br />2.00 <br />Sta 69+10 <br />to Sta 71+10 (Rt) <br />2.00 <br />Tota I : 6.77 <br />SHOULDER BACKING <br />Location Quantity (TON <br />Sta 65+77 to Sta 67+77 (Lt & Rt) 21 <br />Sta 69+10 to Sta 71+10 (Lt & Rt) 7 <br />Total : 28 <br />COUNTY OF SAN JOAQUIN NO SCALE <br />DRAWN BY DATE PROJECT ENGINEER DATE <br />Vincent �i Oct2019 <br />P�64--1 /11� <br />HOT MIX ASPHALT (TYPE A) <br />Location Quantity (TON' <br />Grind and Replace Pavement 8,242 <br />(Includes French Camp Rd Intersection) <br />Pavement Reconstruction 1,424 <br />HMA Dike 5 <br />Total : 9,671 <br />PLACE HOT MIX ASPHALT DIKE <br />(TYP E A) <br />Location Quantity (LF) <br />Sta 65+77 to Sta 67+77 (Lt) 202 <br />Total : 202 <br />18" STORM DRAIN INLET <br />Location Quantity (EA) <br />Sta 36+26 (112' Lt) 1 <br />Total : 1 <br />4" PAINT TRAFFIC <br />ASPHALTIC EMULSION <br />(FOG SEAL COAT) <br />Location <br />Location <br />EL DORADO ST <br />Quantity <br />(SYQD) <br />PAVED SHOULDER <br />3,538 <br />Detail 27B <br />12,222 <br />Sta <br />9+20 to Sta <br />65+77 <br />9,971 <br />Sta <br />71 +10 <br />to Sta <br />75+43 <br />770 <br />AC DIKE <br />Sta <br />45+95 <br />to Sta <br />47+70 <br />(Lt) <br />30 <br />Sta <br />50+08 <br />to Sta <br />52+80 <br />(Lt) <br />46 <br />Sta <br />53+70 <br />to Sta <br />64+12 <br />(Lt) <br />187 <br />Sta <br />50+50 <br />to Sta <br />50+61 <br />(Rt) <br />11 <br />Sta <br />50+57 <br />to Sta <br />51+42 <br />(Rt) <br />18 <br />Sta <br />55+00 <br />to Sta <br />65+77 <br />(Rt) <br />183 <br />Sta <br />57+19 <br />to Sta <br />62+90 <br />(Rt) <br />97 <br />Total <br />11,313 <br />COUNTY OF SAN JOAQUIN NO SCALE <br />DRAWN BY DATE PROJECT ENGINEER DATE <br />Vincent �i Oct2019 <br />P�64--1 /11� <br />HOT MIX ASPHALT (TYPE A) <br />Location Quantity (TON' <br />Grind and Replace Pavement 8,242 <br />(Includes French Camp Rd Intersection) <br />Pavement Reconstruction 1,424 <br />HMA Dike 5 <br />Total : 9,671 <br />PLACE HOT MIX ASPHALT DIKE <br />(TYP E A) <br />Location Quantity (LF) <br />Sta 65+77 to Sta 67+77 (Lt) 202 <br />Total : 202 <br />18" STORM DRAIN INLET <br />Location Quantity (EA) <br />Sta 36+26 (112' Lt) 1 <br />Total : 1 <br />4" PAINT TRAFFIC <br />STRIPE (1 COAT) <br />Location <br />Quantity (LF) <br />EL DORADO ST <br />Detail 12 <br />12,222 <br />Detail 22 <br />3,538 <br />Detail 27B <br />12,222 <br />Detail 32 <br />17,368 <br />FRENCH CAMP RD <br />Detail 22 <br />808 <br />Detail 27B <br />808 <br />SUMMARY OF QUANTITIES <br />CHECKED BY DATE <br />to*- 4t o -x 1 i/Z �/�9 <br />8" PAINT TRAFFIC STRIPE (1 COAT) <br />Location Quantity (LF) <br />EL DORADO ST <br />26 Locations 2,731 <br />Total : 2,731 <br />PAINT PAVEMENT MARKINGS <br />(1 COAT) <br />Location Quantity (SQFT) <br />80 Locations 2,360 <br />Total : 2,360 <br />PAVEMENT MARKER <br />Location Quantity (EA) <br />EL DORADO ST <br />Sta 69+10 to Sta 75+43 1,537 <br />FRENCH CAMP RD <br />Sta 17+40 to Sta 22+60 72 <br />Total : 1,609 <br />t <br />ma-LownD DRAWING <br />C. C©rrMl©ns ®y <br />No Chance <br />Data <br />Any Person Using This Drawing Should Verity <br />API I By Inspecting The Site Of Wd <br />EL DORADO STREET RESURFACING <br />(Interstate 5 to Stockton City Limits) <br />O gRDf ESS/0 <br />uj No. 83958 <br />�9T C/V <br />F QF CA - <br />MA T.4 La <br />Awni Taha <br />RCE 83958 <br />Sheet No. <br />11 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.