My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2013_PS-1300501 thru PS-1301000_ - PS-1300549
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2013
>
PS-1300501 thru PS-1301000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2013_PS-1300501 thru PS-1301000_ - PS-1300549
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:14:18 PM
Creation date
12/30/2015 5:53:34 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1300549
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2013\PS-1300501 thru PS-1301000
Year2
2013
Supplemental fields
Applicant
TARLOCHANS GREWAL
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
BELL HOLE
Owners
Parcel Address
BOTH SIDES OF HANSEN RD 1690' SOUTH OF SCHULTE RD
Primary Parcel
Type (2)
PS-1300549
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Special Conditions for -2- <br /> ENCROACHMENT PERMIT <br /> 13. In addition to standard dust control measures, streets shall be maintained in a clean condition, <br /> free of dirt, mud and debris during construction activities. The contractor shall provide daily, or as <br /> needed, street sweeping using a modern mechanical or vacuum-assisted street sweeper. <br /> 14. The contractor shall not conduct construction operations in rain or heavy fog conditions. <br /> 15. Contractor shall establish existing roadway and drainage grades within the construction area. <br /> Any repair to roadways and adjacent areas shall match existing grades. Any proposed grade <br /> changes shall receive prior approval from County. <br /> 16. Any drainage ditches disturbed by construction shall be fully restored. It is the responsibility of the <br /> applicant to ensure existing drainage channels/ditches convey drainage during and after <br /> construction and match pre-construction conditions. <br /> 17. Contractor shall ensure that the exposed end of the pipe extend beyond the County right-of-way. <br /> 18. Applicant is required to enter into an agreement with San Joaquin County Public Works providing <br /> for maintenances of the section above the pipeline. The obligations and covenants contained with <br /> the agreement shall run with the land. <br />
The URL can be used to link to this page
Your browser does not support the video tag.