My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2013_PS-1300501 thru PS-1301000_ - PS-1300680 (4)
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2013
>
PS-1300501 thru PS-1301000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2013_PS-1300501 thru PS-1301000_ - PS-1300680 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:14:56 PM
Creation date
12/30/2015 5:33:43 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1300680 (4)
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2013\PS-1300501 thru PS-1301000
Year2
2013
Supplemental fields
Applicant
PACIFIC GAS & ELECTRIC - STOCKTON
Contracts
CrossReference
Date Entered
6/10/2013
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
N/S OF WOODBRIDGE RD. 325' W/O UNION PACIFIC RR TR
Primary Parcel
Type (2)
PS-1300680
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
w <br /> PS-1300880 November 19,2013 <br /> SPECIAL CONDITIONS FOR <br /> ENCROACHMENT PERMIT <br /> 1. Shoulder backing shall be backed with Class II Aggregate Base from edge of pavement a <br /> minimum of 4-inches thick by 4-foot wide. <br /> 2. County roads shall be kept clean from mud and debris at all times along the access points and <br /> work zone areas during entire project. All standard roadway striping and signage shall be clearly <br /> visible, maintained and restored throughout the construction zone during and after the project. <br /> 3. In addition to standard dust control measures, streets shall be maintained in a clean condition, <br /> free of dirt, mud and debris during construction activities. The contractor shall provide daily, or as <br /> needed, street sweeping using a modern mechanical or vacuum-assisted street sweeper. <br /> 4. The contractor shall not conduct construction operations in rain or heavy fog conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.