Laserfiche WebLink
LEGENDS·Sheet 1:·Sheet 2:·Sheet 3:·Sheet 4-6:·Sheet 7:·Sheet 8-12: CHC ConsultingPLANS PREPARED BY:WORK LOCATION ADDRESS# 99 FRONTAGE RD & E MORSE RD, LODI, CAJOB NO# JB629115BUILD·Bore Footage(s):·Trench footage(s):·Rock Saw Footage(s):·Emt Footage(s):·Bore Pit(s):·Anchor(s):·Pothole(s) (2X2):·New CATV Vaults(s):·Existing CATV Vault(s):·New Pole(s):·Existing Pole(s):·New Pedestalss):·Existing Pedestal(s):·Overpull Existing Conduit:·(N) Overlash:·Concrete R&R(Sq. FT.)·Asphalt R&R(Sq. FT.)·Total Footage(s):178000122100700034300521·Scope of Work to Target Address 4660 E MORSE RD·This project proposes to tie in at existing pole#1 and riser down. Bore approx. 178' to place 2-2"conduit from existing pole#1 to City ROW via (N) Comcast vault #1 and then overlash fiber approx.343' from City ROW to City ROW via 3 poles on 99 Frontage Rd & E Morse Rd.·Place new anchor on pole #4 & #6.·We will not disturb any monuments we pass. Our path of travel will remain 10' from monument.·Estimate construction days : 4 DaysVICINITY MAPWORK LOCATION~~~~~~~Cover-TitleSymbology & AbbreviationsConstruction Plans (99 Frontage Rd & E Morse Rd.)Typical Details SheetTCP General Tables & NotesTraffic Control PlanE MORSE RD99 FRONTAGE RD