Laserfiche WebLink
STORM LIDWATER VALVEWATER VALVEWATER VALVEWATER VALVEWATER VALVESTORM LIDWATER METERDRIVEWAYWATER METERDRIVEWAYDRIVEWAYDRIVEWAYUNKN. SBUNKN. SBUNKN. SBSTREET LIGHTCABINETHANDICAP RAMPHANDICAP RAMPWATER METERWATER METERWATER METERPEDEXIST. SB #731STREET LIGHTUNKN. SBUNKN. SBDRIVEWAY824 DOUGLAS RD8008006315 PACIFIC AVEP/LP/LP/LP/L0+00CL0+00CL0+00CL0+00CL0+30 R/W0+22 FOC0+27 BOS0+22 FOC0+30 R/W0+26 BOS0+22 FOC0+30 R/W0+26 BOS0+22 FOC0+30 R/W4' CSW4' DIRT 4' CSW4' DIRT <br />5' CSW3' DIRT226'1DOUGLAS RDCOUNTY OF SAN JOAQUINCITY OFSTOCKTONCOUNTY OFSAN JOAQUINCITY OF STOCKTONEXIST. DUCTEXIST. DUCT824 DOUGLAS RD19'N POLEFOCFACE OF CURBPROPOSED CONDUITR/WRIGHT OF WAYCLCENTERLINELEGENDBOSBACK OF SIDEWALKSSTOP SIGNCSWCONCRETE SIDEWALKCONSTRUCTION NOTESSAFETY NOTE WORK AREA WILL INCLUDE LANECLOSURE ON ROAD WITH VERY HIGHTRAFFIC VOLUME. PLEASE PROVIDECOMPLETE WORK AREA PROTECTION.GENERAL NOTES:1. CONTRACTOR SHALL REQUEST LOCATION OFUNDERGROUND FACILITIES BY USA2. CONTRACTOR WILL COMPLY WITH ALLSAN JOAQUIN COUNTY REGULATIONS FOR SPLICEPIT & SURFACE COMPACTION3. CONTRACTOR WILL RETURN WORK AREA BACKTO ORIGINAL OR BETTER CONDITION PRIOR TOSTART OF WORK4. MAINTAIN 48" MINIMUM COVEREXCAVATION DATAEOPEDGE OF PAVEMENTFOLLOW PROCEDURES AS DETAILED INNORTHERN SECTOR PLAN FOR PROTECTIONOF UNDERGROUND AND BURIED CABLEM.O.P. DATEDM.O.P REQUIREDCATEGORY - 3Call USA @ 81148hrs prior to start of workFENCE CHC Consulting02/03/20221/2"0'1"0'30'15'BBSEE MATCH LINE ON SHEET#3AASEE MATCH LINE ON SHEET#2DIG 4'X4' PIT 1LOCATE EXIST.DUCT & CLEAR BLOCKED CONDUIT IN ASPHALT 226' FROM EXIST. SB #731NOTE: SEE SHEET 4 FOR TYPICALTRENCH BACKFILL DETAIL