My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2022_PS-2201001 thru PS-2201500_ - PS-2201143
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2022
>
PS-2201001 thru PS-2201500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2022_PS-2201001 thru PS-2201500_ - PS-2201143
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2022 9:21:43 AM
Creation date
9/27/2022 9:18:11 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2201143
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2022
Notes2
Ash St. and French Camp Rd. at UPRR Tracks
Address
P.O. Box 1270, Verdi, NV, 89439
Application
Roadsafe Traffic Systems
Type
Traffic Control Devices
Supplemental fields
Cross Ref
PWP7110005
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PS-2201143 April 6, 2022 <br /> <br />SPECIAL CONDITIONS FOR <br />UPRR – ASH ST. & FRENCH CAMP RD. <br />ENCROACHMENT PERMIT <br /> <br />1. Maintain traffic controls for all roads identified in the traffic control plan. Traffic control delays <br />shall not exceed 15 minutes. Two-way traffic shall be maintained during non-working hours with <br />excavated areas backfilled or plated. During working hours, two-way traffic control shall be <br />maintained with one lane open and appropriate flaggers. <br /> <br />2. Access to all properties shall be maintained at all times except when work is occurring at the <br />access point. Minimal delays will be allowed to provide access within the work zone area. <br /> <br />3. Residents and businesses shall be notified in writing, as approved by the County, 48 hours in <br />advance of any impacts to their access. <br /> <br />4. Any areas where parking is to be restricted shall have signs noting the restrictions in place at <br />least 48 hours in advance. <br /> <br />5. Existing fences shall not be removed without written consent of the property owner. Such consent <br />shall be submitted to the County prior to the removal. Fences removed shall be restored with in- <br />kind or better materials. Restored fences shall not encroach into County right-of-way. <br /> <br />6. All destroyed or obliterated pavement markings must be replaced in kind by the permittee. Typical <br />pavement markings include but not limited to lane lines, centerlines, stop and stop ahead <br />legends, limit lines, raised pavement markers and miscellaneous delineators. <br /> <br />7. The Permittee is responsible for the preservation of survey monuments located within the area of <br />work herein permitted. Prior to the start of construction, survey monuments that potentially may <br />be disturbed shall be located and referenced by a Licensed Land Surveyor, and a Corner Record <br />filed with the County Surveyor. Any Survey Monuments disturbed during the course of <br />construction shall be reestablished by a Licensed Land Surveyor and another Corner Record filed <br />with the County Surveyor. (Land Surveyors’ Act Section 8771) <br /> <br />8. County roads shall be kept clean from mud and debris at all times along the access points and <br />work zone areas during entire project. All standard roadway striping and signage shall be clearly <br />visible, maintained and restored throughout the construction zone during and after the project. <br /> <br />9. In addition to standard dust control measures, streets shall be maintained in a clean condition, <br />free of dirt, mud and debris during construction activities. The contractor shall provide daily, and <br />as determined to be necessary by County inspectors, street sweeping using a modern <br />mechanical or vacuum-assisted street sweeper. <br /> <br />10. The contractor shall not conduct construction operations in rain or heavy fog conditions.
The URL can be used to link to this page
Your browser does not support the video tag.