Laserfiche WebLink
PS -2200648 <br />SPECIAL CONDITIONS FOR <br />ARNAUDO BROS. — FINCK RD. <br />ENCROACHMENT PERMIT <br />March 1, 2022 <br />1. Maintain traffic controls for all roads. Traffic control delays shall not exceed 15 minutes for local <br />traffic. Two-way traffic shall be maintained during non -working hours with excavated areas <br />backfilled or plated. During working hours, lane closure shall be used within the road closure to <br />regulate local traffic thru immediate work zone. <br />2. Access to all properties shall be maintained at all times except when work is occurring at the <br />access point. Minimal delays will be allowed to provide access within the work zone area. <br />Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br />contractor shall be replaced with in-kind or better materials. <br />3. Residents and businesses shall be notified in writing, as approved by the County, 48 -hours in <br />advance of any impacts to their access. <br />4. Emergency responder access to effected residences shall be maintained at all times. <br />Any areas where parking is to be restricted shall have signs noticing the time period placed at <br />least 48 hours in advance of the work. <br />Existing fences shall not be removed without written consent signed by the property owner and <br />submitted to the County prior to the removal. Fences removed shall be restored with in-kind or <br />better materials at the edge of the right-of-way. <br />The Permittee shall be responsible for any and all costs associated with the removal, relocation <br />and/or adjustment of the private pipeline as determined by the County at the Permittee's <br />expense. (Streets and Highways Code Section 1463) <br />All future maintenance of the pipeline and related facilities within the County right-of-way will <br />require a San Joaquin County Encroachment Permit. <br />Pipeline shall be on a straight grade a minimum of 30" below ditches or toe of embankment slope. <br />10. Markers are to be set at the County right-of-way line (property line) on both sides of (FINCK <br />ROAD) Identifying the location of the pipeline crossing and the name of the contact person. <br />11. The Permittee is responsible for the preservation of survey monuments located within the area of <br />work herein permitted. Prior to the start of construction, survey monuments that potentially may <br />be disturbed shall be located and referenced by a Licensed Land Surveyor, and a Corner Record <br />filed with the County Surveyor. Any Survey Monuments disturbed during the course of <br />construction shall be reestablished by a Licensed Land Surveyor and another Corner Record filed <br />with the County Surveyor. (Land Surveyors' Act Section 8771) <br />