My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2013_PS-1300501 thru PS-1301000_ - PS-1300912
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2013
>
PS-1300501 thru PS-1301000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2013_PS-1300501 thru PS-1301000_ - PS-1300912
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:15:36 PM
Creation date
12/30/2015 5:47:44 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1300912
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2013\PS-1300501 thru PS-1301000
Year2
2013
Supplemental fields
Applicant
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
Primary Parcel
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PS-1300912 April 4,2013 <br /> SPECIAL CONDITIONS FOR <br /> MACDONALD ISLAND ROAD RE-ALIGNMENT <br /> ENCROACHMENT PERMIT <br /> 1. Maintain traffic controls for all roads. Traffic control delays shall not exceed 15 minutes. <br /> Two-way traffic shall be maintained during non-working hours with excavated areas backfilled or <br /> plated. During working hours, two-way traffic control shall be maintained with one lane open and <br /> appropriate flaggers. No road closures are authorized by this encroachment permit. <br /> 2. The traffic shift shall occur under traffic control. <br /> 3. Access to all properties shall be maintained at all times except when work is occurring at the <br /> access point. Minimal delays will be allowed to provide access within the work zone area. <br /> Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br /> contractor shall be replaced with in-kind or better materials. <br /> 4. Applicant shall provide the County verification from the property owner(s) granting an easement <br /> for new roadway alignment. <br /> 5. The right-of-way process to the County for road easement shall be completed within six months <br /> of final roadway surfacing. <br /> 6. Final acceptance of project will not occur until the right-of-way process is complete and the grant <br /> of easement to the County has been recorded. <br /> 7. Reclamation District shall be responsible for road maintenance until the right-of-way process is <br /> completed and recorded. <br /> 8. Subgrade and base rock grade shall be constructed by Reclamation District and an oiled surface <br /> (dust control) shall be placed before traffic is shifted to new alignment. <br /> 9. If settlement occurs after two months, the Reclamation District shall regrade roadway and <br /> shoulder prior to placement of final surfacing. Final determination shall be made by County <br /> Engineer. <br /> 10. Flexible delineators shall be placed at 100-foot intervals along new edge of travel way on both <br /> sides of road. <br /> 11. The permittee is responsible for any Survey Monuments disturbed by this project and shall file a <br /> corner record to re-establish them using a Licensed Land Surveyor. <br /> 12. Roadside ditches shall be graded to drain towards proposed culverts. <br />
The URL can be used to link to this page
Your browser does not support the video tag.