Laserfiche WebLink
7 565 S ORO AVE. <br />S ORO AVE. & SECTION AVE. <br />-DIG PIT, LOCATE EX. DUCT & CLEAR BLOCKED CONDUIT IN DIRT FROM EX. POLE #7 3 <br />WORK AREA 7 OF 3 <br />U N D EP G R O U N D <br />DIG PIT, LOCATE E. DUCT & CLEAR <br />BLOCKED CONDUIT IN DIRT FROM EX. POLE <br />W0 <br />RDAD WORK <br />0-2 <br />SECTION AVE. ~ 12' <br />25 TIN <br />=11F <br />ROAD <br />WORK <br />WORKAREA p <br />Vyllll qvC <br />El <br />SeCJOn <br />5ewpre <br />S ORO AVE.2 <br />AR A a II t�,� m,, <br />'HOLDER 1565 S ORO AVE. WORK <br />cLOIEo AHEAo <br />c0A <br />3 ON TYPE III <br />BARRICADE W20-1 <br />T.A.N.S.A.T. <br />45' <br />MAX. 4 - <br />BUS STOP <br />CONTACT PROPERTY OWNERS) 72 <br />HOURS PRIOR TO START OF WORK. <br />Q.1 <br />END <br />ROAD WORK <br />ROAD <br />WORK <br />SECTION AVE. <br />25 <br />LEGEND <br />A* PORTARDLE FLASHING ONC.9) <br />C'T UP I SPUR CAPE �ENF FAR <br />ry oNIH-SUP <br />AR • LEALLE <br />OR HAT FICcNIGHTUSEONE WITH ORDCLIP UNsoxO TRAFFIC CONES CUP 13 o SIF DAY 9E ONLY <br />HIT TWE CUP SIGN <br />JCC <br />ASTING SIGN <br />IGNPORED INTERSECT <br />O -rLEE NAARROWPOAPDN <br />O NIiANLESELwwNwADEAOETa NTD <br />FLARGER <br />TARSAL = TOW swwvNO STOPPING My TIME <br />®-ExrriNA DEDEWAv <br />® OVKZONE(ACTrvirvAVEy LIMITS <br />ISSUEDIRECTION OF TRAFFIC <br />DATE <br />at&t 03-08-22 <br />I <br />PHASE 1 OF 1 <br />CONSTRUCTION'. <br />LOCATE EY DUCT &CLEAR <br />NUMBER r <br />E TC -1 OF <br />