Laserfiche WebLink
NOTESa EXHIBIT 2 <br /> 1. If the distance between cross—cuts are less then 150' the entire area <br /> between cross—cuts shall be planed and resurfaced with one (1) inch of <br /> Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard <br /> Drawing Pio.' Rm29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs <br /> within the shoulder or lane, only that area shall be resurfaced as shown. <br /> 4. If cross.—cutting is performed on Local Roads at intervals less then 150' a <br /> Seal Coat for that half of the roadway containing the trench can be used in <br /> lieu of resurfacing. Section 3910.3 (B-2). <br /> 4-1II <br /> U�U <br /> Q � <br /> U O <br /> O <br /> j co <br /> Paved Shoulder--- - 'X0 Q <br /> N 04- <br /> 0 <br /> O� <br /> � II� <br /> W I I II U <br /> O <br /> r <br /> L <br /> T <br /> 0 <br /> L <br /> O1 1 I <br /> Q)) 1 <br /> I 1 I Li.l <br /> T <br /> L <br /> 0 U <br /> o <br /> • 1 J U <br /> CROSS <br /> ANG OF <br /> ` COUNTY ROADWAYS <br /> Reviclon oil ® <br /> _. <br /> COUNTY OF SALNT IOAQUiN <br /> DEPARTMENT OF PUBLIC WORKS <br /> for f-OU rDrawnb�,.TRC Chock e <br />