Laserfiche WebLink
75'100' BUFFER250'250'250'50' OPENING75'250'250'250'T.A.N.S.A.T. (ON BOTH SIDES)T.A.N.S.A.T. (ON BOTH SIDES) <br />17' MAX.12'17' MAX.12'12'12'25' MAX.12' <br />12'12' <br />SPEEDLIMIT35 <br />W LINNE RD. <br />SPEED <br />LIMIT35 <br />S MACARTHUR <br />DR. <br />FLAGGER <br />FLAGGER <br />FLAGGER <br />E.O.P. <br />E.O.P. <br />E.O.P. <br />E.O.P. <br />E.O.P. <br />E.O.P. <br />FOGLINE <br />FOGLINEFOGLINE <br />FOGLINE <br />E.O.P.E.O.P.E.O.P.E.O.P.FOGLINEFOGLINEPOLE <br />MID SPAN <br />TRAFFIC CONTROL EQUIPMENT <br />SHALL MAINTAIN MINIMUM 15' <br />CLEARANCE FROM RAILROAD TRACKS. <br />CONTACT PROPERTY OWNER(S) 72 <br />HOURS PRIOR TO START OF WORK. <br />SPEEDLIMIT35 <br />W LINNE RD. <br />FLAGGERS SHALL REMAIN IN <br />COMMUNICATION VIA RADIO AT <br />ALL TIMES. <br />CONTRACTOR TO CONTACT RAILWAY <br />DEPARTMENT 72 HOURS PRIOR TO <br />START OF WORK.15'75'250'250'250'12'12' <br />SPEED <br />LIMIT35 <br />S MACARTHUR <br />DR.E.O.P.E.O.P.E.O.P.E.O.P.FOGLINEFOGLINERAIL ROAD <br />RAIL ROAD T.A.N.S.A.T.(ON BOTH SIDES)LOCATION MAP <br />WORK AREA 1 OF 1 <br />PHASE 2 OF 3 <br />TC-3 1:60 <br />A02ATN5 <br />= TRAFFIC CONE WITH CLIP ON SIGN <br />FOR DAY/NIGHT USE OR DELINEATORS IF DAY USE ONLY= 28" (11cm) TRAFFIC CONES W/ 13" (5cm) REFLECTIVE SLEEVE <br />LEGEND <br />= FLAGGER <br />= EXISTING DRIVEWAY <br />= HIGH LEVEL WARNING DEVICE (FLAGTREE) <br />= FLASHING ARROWBOARD <br />= SIGNALIZED INTERSECTION <br />= TOW AWAY NO STOPPING ANY TIME <br />= TYPE III BARRICADE W/SIGN (5'H x 4'W) <br />= TYPE II BARRICADE W/SIGN (3'H x 2'W) <br />= TYPE I W/ SIGN <br />= DIRECTION OF TRAFFIC <br />= PORTABLE FLASHING BEACON (P.F.B.) <br />= WORK ZONE (ACTIVITY AREA) LIMITS <br />= EXISTING SIGN <br />8880 W LINNE RD. <br />W LINNE RD. & S MACARTHUR DR. <br />AERIAL PLACEMENT <br />WORK AREA 1 OF 1 <br />PHASE 2 OF 3 <br />N <br />TC-4 <br />AERIAL PLACEMENT <br />MAINTAIN DRIVEWAY ACCESS <br />AT ALL TIMES <br />PAGE: OF <br />TYPE OF CONSTRUCTION: <br />JOB NUMBER:SCALE: <br />03-03-22 <br />ISSUE DATE <br />1 <br />PHASE 2 OF 3MATCHLINE-BSEE-TC-2 OF TC-4MATCHLINE-C <br />MATCHLINE-C